Skip to main content

Mott MacDonald to design highway improvements in Czech Republic

Mott MacDonald has been appointed by the Road and Motorway Directorate of the Czech Republic to design sections of the R35 and R55 expressways. R35 connects the Bohemia and Moravia regions and runs parallel to the D1 motorway, the longest in the country. Mott MacDonald will design a 5.8km section of the expressway, including three bridges, two interchanges, two roundabouts, four overpasses and one railway viaduct. One watercourse will also be relocated as part of the scheme.
August 6, 2015 Read time: 2 mins
2579 Mott MacDonald has been appointed by the 2873 Road and Motorway Directorate of the Czech Republic to design sections of the R35 and R55 expressways.

R35 connects the Bohemia and Moravia regions and runs parallel to the D1 motorway, the longest in the country.

Mott MacDonald will design a 5.8km section of the expressway, including three bridges, two interchanges, two roundabouts, four overpasses and one railway viaduct. One watercourse will also be relocated as part of the scheme.

The consultancy will also design 5.3km of road for the R55 expressway, which links the city of Olomouc to the town of Breclav. Works include seven bridges, two overpasses, a railway bridge, 15 retaining walls and six noise barriers, as well as the relocation of a bus stop.

“Our duties will include preparing the planning permit documentation for everything from preliminary designs for highways, bridges, retaining walls and drainage, to noise and dispersion studies and environment impact assessments,” said Jan Semerad, Mott MacDonald’s project director.

Design work will be finished by the end of the first quarter of 2016.

“These projects continue our substantial involvement in modernising the Czech Republic’s motorway network, as Mott MacDonald is also leading a joint venture that was recently appointed to modernise section 10 of the D1 motorway,” he said.

Mott MacDonald, an employee-owned company, in based near London, UK and has 16,000 employees globally. Turnover is around US$2 billion, coming projects in many sectora apart from transport infrastructure -- buildings, communications, mining, oil and gas, power, water and wastewater, as well as urban development.

The company recently completed an urban mobility study for the Kenyan capital city Nairobi, looking at transport options to support the city’s economic development under its Vision 2030 plan.

For more information on companies in this article

Related Content

  • Mott MacDonald wins Erika storm damage repair work in Dominica
    August 16, 2017
    Mott MacDonald is providing design work for 20km of the Loubiere to Bagatelle road rehabilitation project in Dominica. The client, Dominica’s ministry of public works, is repairing the route following significant damage by tropical storm Erika in 2015. A grant from the UK’s Department for International Development has been provided to Dominica through the Caribbean Development Bank. Completion of works Mott MacDonald’s work is expected in 2019.
  • Another permit for Czech Republic’s D35
    October 27, 2023
    The D35 section is part of the grade-separated junction with the D11 near Hradec Králové to Sadová.
  • Mott Macdonald handling major Hong Kong project
    July 24, 2012
    Engineering firm Mott MacDonald has been commissioned to head the team designing the Hong Kong-Zhuhai-Macau Bridge link road. The Dragages-China Harbour-VSL joint venture appointed Mott MacDonald as lead designer for the 9.4km long viaduct section of the Hong Kong-Zhuhai-Macau Bridge. This US$1.66 (HK$12.9 billion) project is the largest single design and build contract ever awarded in Hong Kong. The bridge will carry a dual three-lane carriageway over the Pearl River Estuary, which is one of the world’s bu
  • Czech highway deal for consortium partners
    February 5, 2019
    A consortium has won a package of works to construct a section of the D35 highway in the Czech Republic. The 12.6km stretch of the D35 highway lies between Opatovice and Časy and the project has a contract value of €132 million, with the work expected to take 44 months to complete. The consortium is headed by Austrian contractor STRABAG with a 41% stake in the deal and also includes the Czech firms Silnice and SMP CZ. This new four-lane link will feature two interchanges. The D35 is part of the northern