Skip to main content

Modelling software aids highway widening

The Skanska Balfour Beatty Joint Venture has been selected by Autodesk to receive an Autodesk BIM Experience Award.
February 22, 2012 Read time: 2 mins
The M25 motorway around London is being widened with the help of software from Autodesk
The 2296 Skanska 1146 Balfour Beatty Joint Venture has been selected by  685 Autodesk to receive an Autodesk BIM Experience Award.

The companies are being honoured for using a Building Information Modelling (BIM) process to meet the demands of widening 64km of the
188km M25 motorway that
circles London, in preparation
for the 2012 Olympic Games.

The award from Autodesk, a leader in 3D design, engineering and entertainment software, recognises 3005 Atkins and the joint venture for “the
exemplary use of a BIM process” to inform decision-making for improved safety; foster better understanding of the design among project engineers; coordinate design disciplines and resolve interdisciplinary conflicts prior to construction, reducing potentially costly errors, and virtually plan production to meet a fast-track schedule while maintaining ongoing operations on a busy highway.

Since 2009, the design-build team has used Autodesk BIM solutions to collaborate on the project, helping to resolve construction issues virtually before they happen in the field. Autodesk software solutions used to support this BIM process include AutoCAD, Autodesk Navisworks Manage, Autodesk Navisworks Freedom, and AutoCAD Civil 3D software.

To help meet the aggressive design-build schedule, the project team relies on a coordinated, accurate design intent model. The Autodesk Navisworks integrated design model helps the team visualise the entire project, including all above and below ground components, as well as nonphysical aspects of the design, such as safety barrier working zones.

For more information on companies in this article

Related Content

  • Seal of approval for Sika
    June 22, 2012
    Skikaflex Construction by UK-based Sika was chosen by Skanska Balfour Beatty Joint Venture to seal movement joints during the widening of one of Europe’s busiest motorways. The M25, also known as the London Orbital, handles around 200,000 vehicles every day on its busiest sections. Its widening between junctions 27 and 30 is said to be delivering much needed extra capacity to tackle congestion and improve journey times.
  • Pressure is on Superslim formwork
    February 4, 2025
    Temporary works specialist Altrad RMD Kwikform - Altrad RMDK - is helping realign the A452 road over a new rail line for England’s future high-speed trains.
  • Sophisticated software solutions offering surveying innovation and construction efficiency
    August 28, 2014
    An array of new software tools will deliver greater efficiencies to construction companies – Mike Woof writes. Sophisticated software systems are delivering advanced solutions to traditional construction tasks. Key developments have been made by major players in the sector, such as Bentley Systems, Fugro Roadware, Leica Geosystems and Topcon Sokkia. From Bentley comes a new package that will help road construction activities in urban areas featuring a heavy concentration of underground utilities. This n
  • Software tools aid construction, reduce costs
    February 28, 2012
    Integrated construction software offers an effective planning solution - *Mark Nichols writes. In a world where resources are limited, 20 year designing and building in a sustainable way is more critical than ever. By employing today's software tools it is possible to reduce the total cost of construction of a new highway, while reducing operating costs and environmental impacts. The path to achieving the greatest gains is to take a holistic approach to the plan, design, construct and operate process from t