Skip to main content

Latvia road design contract for capital Riga

A road design study is now being carried out for Latvian capital Riga. The study will evaluate solutions for connecting parts of the city and its port to the main Latvian highway network. The study will be part-funded by the EU’s TEN-T Programme, which is providing close to €1.8 million. The project will be completed by the 31st December 2015 and involves the construction of a new link to the Freeport of Riga that will carry heavy goods vehicles, reducing traffic volumes and congestion in the historic city
November 11, 2014 Read time: 2 mins
A road design study is now being carried out for Latvian capital Riga. The study will evaluate solutions for connecting parts of the city and its port to the main Latvian highway network. The study will be part-funded by the 3287 EU’s TEN-T Programme, which is providing close to €1.8 million. The project will be completed by the 31st December 2015 and involves the construction of a new link to the Freeport of Riga that will carry heavy goods vehicles, reducing traffic volumes and congestion in the historic city centre. The detailed design studies are focussing on the two last segments, 3 and 4, or roughly half of the Northern Corridor, a 30km long inner city highway intended to relieve the Latvian capital from freight traffic. This new route will improve transport efficiency in the Greater Riga region, as well as integrating the city and the Freeport with the Trans-European road network. The project was selected for EU funding with the assistance of external experts under the TEN-T Annual Call 2013, priority 'Road transport'. Its implementation will be monitored by INEA, the 2465 European Commission's Innovation and Networks Executive Agency.

For more information on companies in this article

Related Content

  • California turns towards a Texas solution for u-turn design
    July 24, 2019
    The first so-called Texas U-Turn in the US state of California has opened as part of the Gerald Desmond Bridge Replacement project at Long Beach. The design enables trucks and other vehicles to make a safe and free-flowing U-turn at the west end of the project at the port access undercrossing, a second tunnel near the intersection of Ocean Boulevard and State Route 47 (SR-47) on Terminal Island. The Texas U-turn - named because it is a common feature at intersections in the state of Texas - enables ve
  • RMD formwork for Qatar’s tallest bridge on Doha East Corridor
    July 6, 2016
    RMD Kwikform will be supplying tens of thousands of tonnes of its formwork and shoring for construction of Qatar’s tallest bridge on the Doha East Corridor project As well as the bridge, the Corridor contract comprises four interchanges at a total cost of US$612.5 million. Ashghal, Qatar's Public Works Authority, awarded the Corridor project to China Harbour Engineering Design and Construction. Built as a five-lane 11km bypass in Doha, the capital of Qatar, the project will also cater for a rail line
  • FEHRL holds successful infrastructure research event in Brussels
    June 22, 2015
    FEHRL recently held the FIRM15 event in Brussels, focussing on innovative maintenance of transport infrastructure In all some 110 transport infrastructure research experts from Europe and beyond met for the 2015 FEHRL Infrastructure Research Meeting (FIRM15) at the Diamant Centre in Brussels, Belgium. These professionals discussed the overall theme of 'Innovative maintenance of transport infrastructure: Faster, cheaper, more reliable, safer and greener'. Throughout the two-day conference, several solution
  • Germany to cut red tape for bridge construction up to 2027
    October 5, 2017
    The German federal government has set aside €4.5 billion for refurbishment of 400 bridges in the state of North Rhine-Westphalia up to 2027. Hendrik Wüst, North Rhine-Westphalia transport minister, made the announcement which included around €200 million for road maintenance. The Federal German government also plans to fast-track planning for infrastructure projects. Bonuses to contractors for improved performance to reduce down-time on construction sites as well as the possibily of a six-day working