Skip to main content

IL&FS to widen Patna-Gaya-Dobhi road in India’s Bihar state

The National Highways Authority of India (NHAI) has awarded a highway widening contract worth US$202 million (INR 12.32 billion) to IL&FS Engineering and Construction Company. IL&FS will widen to four lanes 127km of the Patna-Gaya-Dobhi section of NH-83 in the north eastern Indian state of Bihar. The project is due for completion in three years and it will be undertaken under the Official Development Assistance Loans programme of the Japan International Cooperation Agency (JICA).
October 16, 2014 Read time: 2 mins
The 292 National Highways Authority of India (NHAI) has awarded a highway widening contract worth US$202 million (INR 12.32 billion) to 3148 IL&FS Engineering and Construction Company.

IL&FS will widen to four lanes 127km of the Patna-Gaya-Dobhi section of NH-83 in the north eastern Indian state of Bihar.

The project is due for completion in three years and it will be undertaken under the Official Development Assistance Loans programme of the 2416 Japan International Cooperation Agency (JICA).

IL&FS Engineering, based in Hyderabad, is an infrastructure construction and project management company operating in the buildings, roads, railways, irrigation, power, ports and oil & gas sectors.

IL&FS announced in April that its subsidiary Maytas Infra Saudi Arabia (MISA) had received a letter of acceptance for $44.5 million of road drainage works at King Abdul-Aziz International Airport in Jeddah, Saudi Arabia. The contract involves construction of road drainage works including excavation, steel reinforcement, concrete works, erection and backfilling.

For more information on companies in this article

Related Content

  • New India highway deal for Uttar Pradesh
    March 26, 2018
    A new highway project is being planned for India’s Uttar Pradesh State. The US$522.7 million project will see a 100km section of the Hapur Bypass being widened, so that it will feature three lanes in either direction. This section of the route is from Moradabad to Hapur and the work will be carried out by IRB Infrastructure Developers. The contract was awarded by the National Highways Authority of India (NHAI) under the build, operate and transfer model.
  • Malaysian firm building Indian link
    March 5, 2012
    Plans are now in hand in India for construction of the Jetpur-Somnath Section NH-8D highway in the state of Gujarat.
  • Nepal’s Kathmandu-Terai Fast Track road to be built under annuity model?
    March 31, 2014
    India's Infrastructure Leasing & Financial Services (IL&FS) has offered to build the 76km, US$1.01 billion Kathmandu-Terai Fast Track road in Nepal under an annuity model, proposing that the government issue a global tender. This model is suitable as investors, including IL&FS and other Indian firms Reliance Infrastructure and Larsen & Toubro, have proved unwilling to undertake the project under a BOOT system. The Kathmandu-Terai Fast Track road will carry an estimated 3,000 vehicles a day.
  • Rajasthan Mega Highways boost trade, tourism
    February 17, 2012
    Rajasthan is one of the most favoured tourist destinations of India for both domestic and international traffic on account of its rich array of historical forts, palaces, art and culture.