Skip to main content

HyperTunnel and U Birmingham to cooperate

HyperTunnel, based in the UK, said its new construction methods will reduce carbon footprints by building tunnels more than 10 times faster and at half the cost of conventional methods.
By David Arminas December 30, 2022 Read time: 2 mins
HyperTunnel recently unveiled what it says is the world’s first entirely robot-constructed underground structure, built at the company’s R&D facility near London (image courtesy hyperTunnel/University of Birmingham)

The University of Birmingham and hyperTunnel, a UK company developing underground construction methods, will cooperate to develop a faster, more efficient tunnelling method.

In particular, they will focus on new methods of underground construction, enlargement, monitoring and repair of tunnels.
 
A joint statement said that their new automated construction methods being developed by hyperTunnel will reduce carbon footprint by building tunnels more than 10 times faster and at half the cost of conventional methods.
 
At the heart of the concept is the use of robots to 3D-print the shell of the underground structure, according to a digital twin. Using this method, the construction material is deployed directly into the ground.
 
Initially focusing on autonomous tunnelling technologies, imaging and digital simulations, the partnership is likely to include activities such as collaborative research, technology projects, joint publications, secondments, internships and education programmes.  
 
Key is the University of Birmingham’s National Buried Infrastructure Facility - part of the UK Collaboratorium for Research on Infrastructure and Cities. UKCRIC is designed to stimulate research activities in the fields of infrastructure and cities through close collaboration between academia, industry and government. The National Buried Infrastructure Facility is researching soil/structure interaction, digital twinning, tunnelling and quantum-technology sensing.  
 
HyperTunnel and the University of Birmingham will also engage in joint activities at the university’s new campus in Dubai, which includes the development of a multi-million-pound Tunnelling Centre of Excellence, said Nicole Metje, professor of infrastructure monitoring at the University of Birmingham.

“Both our organisations are deeply involved in radically innovating underground infrastructure and use of underground space,” said Jeremy Hammond, hyperTunnel co-founder.

HyperTunnel says it uses a combination of proven technologies such as digital twins, robotics, 3D printing and digital underground surveying, supported by artificial intelligence and visual reality – to “redefine” what is possible in tunnel construction, enlargement, monitoring and repair.

HyperTunnel was founded in 2018 by businessmen Steve Jordan and Jeremy Hammond and employs 40 people at its Basingstoke headquarters and at its nearby outdoor learning environment and geola. The company’s patented methodologies and its range of products and technologies, many of which have patents pending, are available via licence, leasing, consultancy and project support.

The University of Birmingham’s National Buried Infrastructure Facility (NBIF) is part of UKCRIC – the UK Collaboratorium for Research on Infrastructure and Cities. It offers research, education and training in buried infrastructure-ground interaction, soil stabilisation and improvement, geophysical sensing as well as trenching and trenchless technologies.

Related Content

  • How bitumen technology solutions are solving paving problems around the world
    March 2, 2017
    This month we hear how additives can bring RAP back from the dead and fight the ravages of salt damage, how pellets reach parts that PMB can’t and how Shell and WeedsWest are expanding their respective businesses - Kristina Smith writes
  • Sophisticated trainer tool from Immersive
    April 12, 2018
    Immersive Technologies says that demand is strong for its highly sophisticated virtual reality operating training technology. The latest generation WorksiteVR Simulator from the firm is said to be both portable and affordable and is aimed straight at the construction training market. The virtual reality simulators are said to be easy to transport as they fit in two cases that can be checked in on a plane or transported between sites. This ease of portability is a key feature of the unit’s versatility. U
  • Record breaking underground parking facility for Shanghai
    August 4, 2023
    CRCHI is helping build a record breaking underground parking facility in Shanghai
  • Without political intervention, new technologies for using waste rubber in roads will not take off
    November 14, 2017
    New technologies to make rubber modification of asphalt are under development and testing. But political will is the real key to diverting old tyres from landfill - Kristina Smith reports. A new way to introduce end-of-life tyre rubber into asphalt mixes could be the key to diverting more tyres away from landfill, according to Dr Davide Lo Presti, principal research fellow at the Nottingham Transportation Engineering Centre (NTEC) at the University of Nottingham.