Skip to main content

Fugro to use its ARAN system in Dutch surveying deal

Fugro, a geo-data specialist, is using the latest version of its Automatic Road Analyser (ARAN) in a new five-year pavement survey contract for Dutch highways. The contract, with an option to extend to 10 years, was awarded by the Dutch infrastructure agency Rijkswaterstaat. It includes the collection of surface condition and road measurement data from 8,600km of principal highways each year. The company’s Automatic Road Analyser - ARAN - which is adapted to meet European specifications and includes i
May 9, 2019 Read time: 2 mins
Fugro’s latest Automatic Road Analyser – ARAN – is surveying around 8,600km of Dutch main roads

6202 Fugro, a geo-data specialist, is using the latest version of its Automatic Road Analyser (ARAN) in a new five-year pavement survey contract for Dutch highways.

The contract, with an option to extend to 10 years, was awarded by the Dutch infrastructure agency Rijkswaterstaat. It includes the collection of surface condition and road measurement data from 8,600km of principal highways each year.

The company’s Automatic Road Analyser - ARAN - which is adapted to meet European specifications and includes improved crack detection technology. The platform enables surveys to be conducted at traffic speed, providing a cost-effective, safe, precise means of condition monitoring that enables asset managers to identify and predict deterioration and prioritise expenditure, according to the company, based in the Netherlands.

The ARAN provides fully automated collection of multiple data streams via positioning, video and laser imaging systems that can be tailored to project needs. Options include profile, camber, rutting, cracking, texture and roughness as well as pavement thickness and structure based on ground penetrating radar.

Rijkswaterstaat receives a clear picture of network condition in a format that complies with national standards, the company notes. With the condition surveys repeated annually, maintenance plans can be optimised to target areas of deterioration based on high resolution and repeatable datasets.

Richard Bun, Fugro’s project lead, said the updated ARAN “will further enhance the efficient transfer and usability of important data for Rijkswaterstaat’s asset management system”.

Fugro employing around 10,000 people in 65 countries. Clients are mainly in the energy and infrastructure industries, both offshore and onshore. In 2018, revenue was €1.7 billion. The company is listed on Euronext Amsterdam.

For more information on companies in this article

Related Content

  • Bridge inspection: destructive versus non-destructive methods
    January 6, 2015
    Tens of thousands of bridges in the United States are in desperate need of repair. But where to begin analysing their deteriorating state? Roger Roberts* investigates tips and techniques for ensuring bridge safety The average age of America’s more than 600,000 crumbling bridges is 42 years – many are 60 to 80 years old. The situation is dire, with many described as functionally obsolete, according to the American Society of Civil Engineers’ latest edition of its Report Card for America’s Infrastructure.
  • World Road Meeting 2017
    April 16, 2018
    The IRF World Road Meeting 2017 was held recently – World Highways’ India correspondent Partha Pratim Basistha reports The 18th World Road Meeting of the International Road Federation took place between 14-17 November 2017 in the North Indian state of Uttar Pradesh at Greater Noida near India’s capital New Delhi. Close to 1500 delegates and visitors across the world - including India - from the road infrastructure fraternity participated at the global event. The Cross Roads meeting, coinciding with an ex
  • Set the ALARM for repairs in England and Wales
    January 10, 2019
    More than 3,900km of roads in England and Wales will need essential maintenance within the next year, according to the annual ALARM survey* Cash-strapped local governments are reporting that the gap between the funds they received and the amount they needed for repairs and maintenance was almost €639 million. This equated to an average shortfall of €3.75 million for every authority. It would take 14 years to get local roads back into a reasonable steady state, but only if adequate funds and resources wer
  • Advances in materials testing
    April 10, 2012
    Quicker, better, more cost effective materials testing - Kristina Smith writes. Most developments in materials testing technology involve updating and upgrading existing machines, either to meet changes to standards or to satisfy new needs in the market. And occasionally, a manufacturer will come up with something completely new. PUMA - the precision unbound materials analyser - falls into the latter category. It has been developed by Cooper Research Technology and Nottingham Transportation Engineering Cen