Skip to main content

Digital Construction Works develops new fully-integrated monitoring platform

Machine control specialist DCW (Digital Construction Works) has combined Topcon's monitoring platform with Bentley's Sensemetrics package to create a new solution that ties IoT sensors and monitoring systems to give contractors rapid project information in near real-time.
October 6, 2022 Read time: 2 mins
Monitoring Technology for Hudson Tubes

DCW’s new monitoring system has evolved from the company’s mission “to enable higher levels of construction project efficiencies through digitally connecting all aspects of a project - the construction ecosystem.”

The firm is jointly backed by Bentley Systems and Topcon Positioning Systems. Its first program was called Constructioneering (which predates DCW) and it was designed to help construction industry professionals achieve better integrations, automated workflows, improved reports and visual representation of the project.

Through its new monitoring system, DCW leverages direct access to Topcon's positioning technology and Bentley's infrastructure IoT technology “while adding the glue that holds it all together … the DCW Integrations Platform.”

Installation of Monitoring Technology for Caltrans
Installation of Monitoring Technology for Caltrans

According to DCW, the platform “remains agnostic and open to new, innovative technologies worldwide. There is demand in the construction industry for an integrations platform that ties together a wide range of geotechnical and geopositioning sensor technology with other project activity data sources of a construction project.

“Monitoring a construction site and long-term monitoring of an existing structure's health involves an array of sensors. Fortunately, sensor technology is rapidly switching to IoT-based sensors wherever possible. The DCW Integrations Platform can tie together these otherwise disparate data sources and provide automated workflows with easy access to summary reports and charts.

“It is a vision of DCW that monitoring data, and monitoring technology typically used only to determine slight movement in an at-risk structure, will soon be leveraged to provide essential and timely insights into a construction project's progress. Technology should be connected, and their data used for more than just a simple Delta XYZ. The natural technology innovation cycle is rapidly changing.

“As an agnostic provider of monitoring services and solutions, DCW is open to integrating what the market provides and what our clients already trust.”

If you would like to read more about DCW and its plans for the future, please click here to see .a recent World Highways roundtable interview with its chief executive officer Jason Hallett: https://www.worldhighways.com/video/digital-construction-works-roundtable-interview

For more information on companies in this article

Related Content

  • Construction trends in North America, looking to the future
    June 10, 2019
    Exciting changes in construction will reward the aware contractor - *Jeff Winke comments Hop in a car and drive anywhere in the US and chances are the drive will be on roads and highways that need patching, resurfacing, or widening, and bridges often show signs of needed maintenance. Sadly, things are in bad shape. On the last two report cards from the American Society of Civil Engineers, the US infrastructure scored a D+. This year’s report urges the government and private sector to increase spending
  • ACO’s Qmax Neo drainage for Costa Rica
    June 16, 2021
    Stormwater drainage by ACO is keeping dry some access roads for National Route 1, the Carretera Interamericana Norte (North Interamerican Road).
  • G&Z’s improved S600 slipformer
    February 18, 2020
    G&Z is now offering its successful S600 Paver, first introduced in 2010, with a new Tier 4 Final emissions compliant engine and enhanced width capability. The new S600 Power Unit was completely redesigned in 2019 and features:
  • Bomag is on track – London to Glasgow in 2 hours and 40 minutes
    July 1, 2022
    British Railways has big plans. Trains on the first 220 km from London Euston Station to Birmingham could be travelling at a speed of 360 km/h (225 mph) in as little as 10 years. The earthworks required for this are to be completed by as early as 2025. The project is considered one of the largest and most ambitious infrastructure projects in recent British history. It must meet the highest possible construction quality standards and evolve over the course of the project - setting new standards today and for tomorrow. The deployment of innovative BOMAG technologies and machines is therefore logical and consistent.