Skip to main content

Bentley Systems is calling for submissions to its awards event

Bentley Systems is calling for submissions to the 2014 Be Inspired Awards program. The deadline for entries is July 10, 2014. The awards are selected by an independent jury of industry experts and identify innovations for design, engineering, construction, delivery and operation of better-performing, safer, and more resilient infrastructure. The 18 award categories cover every aspect of the built environment. All Bentley software users are invited to enter projects in the awards programme, no matter what ph
June 17, 2014 Read time: 2 mins
4019 Bentley Systems is calling for submissions to the 2014 Be Inspired Awards program. The deadline for entries is July 10, 2014. The awards are selected by an independent jury of industry experts and identify innovations for design, engineering, construction, delivery and operation of better-performing, safer, and more resilient infrastructure. The 18 award categories cover every aspect of the built environment. All Bentley software users are invited to enter projects in the awards programme, no matter what phase the project is in – preconstruction/conceptual, design, construction, or built. The three finalists chosen for each Be Inspired Awards category will win a trip to London to attend, as a guest of Bentley Systems, The Year in Infrastructure 2014 Conference, being held November 4th-6th at the Hilton London Metropole in the UK. The finalists will present their projects in the Be Inspired Awards Finals portion of the conference before the judges, industry thought leaders, and more than 100 members of the media gathered for this event, which comprises presentations, summits, and workshops.

The Be Inspired Awards program provides participants with the opportunity to gain global recognition by having their infrastructure projects profiled in Bentley’s Infrastructure Yearbook, which is distributed in print and digital formats to nearly 200,000 key media, government, and industry influencers around the world. In addition, finalists and winning projects are featured on the Be Inspired Project Portfolios website page.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal The Year in Infrastructure 2014 Conference Visit: www.bentley.com/YIIconference false http://www.bentley.com/YIIconference false false%>

Related Content

  • Enerpac launches new Evo synchronous lifting system
    January 6, 2017
    Enerpac is using Bauma to show off its new generation of multi-functional synchronous lifting systems, called the Evo System. The specialised hydraulic engineering and lifting technology manufacturer is using digitally controlled hydraulics on the Evo units and one standard PLC-controlled hydraulic power unit can be used for nine hydraulic movement functions. The integrated touch screen offers a user friendly interface with logical visual system management and navigation says Enerpac. The hydraulic movement
  • Enerpac launches new Evo synchronous lifting system
    February 15, 2013
    Enerpac is using Bauma to show off its new generation of multi-functional synchronous lifting systems, called the Evo System. The specialised hydraulic engineering and lifting technology manufacturer is using digitally controlled hydraulics on the Evo units and one standard PLC-controlled hydraulic power unit can be used for nine hydraulic movement functions. The integrated touch screen offers a user friendly interface with logical visual system management and navigation says Enerpac. The hydraulic movement
  • Topcon’s new Enterprise Solutions workflow management system controls all jobs
    January 6, 2017
    Topcon Positioning Group has released a new workflow management system designed to connect all of a contractor’s sites, data, crews and equipment. Unveiled at Conexpo 2014 this week, Topcon Enterprise Solutions offers constant communication, data sharing, scheduling, updating, support activities and accurate productivity data in real-time, no matter where the job or office is located.
  • Topcon’s new Enterprise Solutions workflow management system controls all jobs
    March 7, 2014
    Topcon Positioning Group has released a new workflow management system designed to connect all of a contractor’s sites, data, crews and equipment. Unveiled at Conexpo 2014 this week, Topcon Enterprise Solutions offers constant communication, data sharing, scheduling, updating, support activities and accurate productivity data in real-time, no matter where the job or office is located.