Skip to main content

Bentley Systems awards winners announced

The winners in the Bentley Systems awards for excellence in infrastructure have been announced. Final judging took place at the Bentley Year in Infrastructure 2018 conference, held in London. Meeting earlier in the week at the London Hilton Metropole Hotel where the event was held, panels of expert judges selected the winners, having previously pre-selected three projects as key contenders. In the roads category, the Pan Borneo Highway in Malaysia’s Sarawak Region beat tough competition to win over the I-5
October 19, 2018 Read time: 2 mins

The winners in the 4019 Bentley Systems awards for excellence in infrastructure have been announced. Final judging took place at the Bentley Year in Infrastructure 2018 conference, held in London. Meeting earlier in the week at the London Hilton Metropole Hotel where the event was held, panels of expert judges selected the winners, having previously pre-selected three projects as key contenders.

In the roads category, the Pan Borneo Highway in Malaysia’s Sarawak Region beat tough competition to win over the I-59/I-20 Corridor project in Birmingham Alabama and construction of the Yaoshan-Luanchuan section of China’s Xhenzhou-Xixia expressway. Measuring 1,060km long, the Sarawak section of the Pan Borneo Highway is a true mega-project . The judges were impressed with the way the enormous quantities of data are being handled, with the project split into 1km sections. Also impressing the judges were the measures made by the construction partners and the 3491 Malaysian Government to leave a local legacy, through training graduates and contractors to utilise this new technology.

In the bridges category, the design and build of the road bridge for the Teluk Lamong Port Project in Indonesia won over the Chenab Bridge in Jammu & Kashmir India, and the Jungkun-Jinjeong Bypass bridge in South Korea. Th judges were convinced by the impressive way in which the Indonesian project team encapsulated the entire project, utilising sophisticated BIM techniques.

Both the Pan Borneo Highway and the road bridge for the Teluk Lamong Port Project will deliver enormous benefits to their respective regions, cutting journey times for drivers, boosting trade and transport and providing valuable economic development. These factors were also rightly recognised by the judges as being important factors.

For more information on companies in this article

Related Content

  • Bentley and Trimble Advance BIM through Construction Modeling
    November 14, 2014
    Software solutions providers Bentley and Trimble will collaborate to develop construction modeling products for asset performance that can be used by clients after handover of a project. The announcement was made simultaneously at their separate conferences -- the Bentley Year in Infrastructure 2014 event in London, UK, and Trimble Dimensions 2014 in Las Vegas. Construction modeling includes modeling of temporary works, intelligent positioning, splitting and sequencing, detailing for fabrication, work
  • Road engineering conference for Malaysia
    August 22, 2012
    The joint organisers of the Road Engineering Association of Asia & Australasia (REAAA) Conference, which will be held in Kuala Lumpur, Malaysia, from 26 to 28 March 2013, have announced that registration is now open on the event website - www.14reaaaconf2013.com. The theme of the event is The Road Factor in Economic Transformation, the focus of which will be on the development and maintenance of an efficient road infrastructure to meet the demands for sustainable economic growth in developing countries.
  • Award for Bayonne Bridge project in the US
    April 2, 2020
    A major engineering award has been given for Bayonne Bridge project in the US.
  • Realigning Kenyan bypass to avoid quagmire and ease congestion
    March 22, 2012
    Japanese consultants are planning to realign a Kenyan bypass, as Shem Oirere reports. Japanese consultants are resolving an engineering quagmire involving a 17.5km bypass in Kenya's Coast region. The new design realigning the bypass is underway by Japanese International Cooperation Agency (JICA) consultants. The road is an alternative link from the hinterland to the south coast and to the proposed Dongo Kundu Port. The 23m-wide bypass would also serve to reduce traffic congestion across the Likoni Channel.