Skip to main content

Bentley Systems awards winners announced

The winners in the Bentley Systems awards for excellence in infrastructure have been announced. Final judging took place at the Bentley Year in Infrastructure 2018 conference, held in London. Meeting earlier in the week at the London Hilton Metropole Hotel where the event was held, panels of expert judges selected the winners, having previously pre-selected three projects as key contenders. In the roads category, the Pan Borneo Highway in Malaysia’s Sarawak Region beat tough competition to win over the I-5
October 19, 2018 Read time: 2 mins

The winners in the 4019 Bentley Systems awards for excellence in infrastructure have been announced. Final judging took place at the Bentley Year in Infrastructure 2018 conference, held in London. Meeting earlier in the week at the London Hilton Metropole Hotel where the event was held, panels of expert judges selected the winners, having previously pre-selected three projects as key contenders.

In the roads category, the Pan Borneo Highway in Malaysia’s Sarawak Region beat tough competition to win over the I-59/I-20 Corridor project in Birmingham Alabama and construction of the Yaoshan-Luanchuan section of China’s Xhenzhou-Xixia expressway. Measuring 1,060km long, the Sarawak section of the Pan Borneo Highway is a true mega-project . The judges were impressed with the way the enormous quantities of data are being handled, with the project split into 1km sections. Also impressing the judges were the measures made by the construction partners and the 3491 Malaysian Government to leave a local legacy, through training graduates and contractors to utilise this new technology.

In the bridges category, the design and build of the road bridge for the Teluk Lamong Port Project in Indonesia won over the Chenab Bridge in Jammu & Kashmir India, and the Jungkun-Jinjeong Bypass bridge in South Korea. Th judges were convinced by the impressive way in which the Indonesian project team encapsulated the entire project, utilising sophisticated BIM techniques.

Both the Pan Borneo Highway and the road bridge for the Teluk Lamong Port Project will deliver enormous benefits to their respective regions, cutting journey times for drivers, boosting trade and transport and providing valuable economic development. These factors were also rightly recognised by the judges as being important factors.

For more information on companies in this article

Related Content

  • India’s IRTE wins top Prince Michael of Kent Safety Award
    July 4, 2019
    India’s Institute of Road Traffic Education (IRTE) was among the international winners at the annual Prince Michael International Road Safety Awards in London. IRTE picked up the Premier Award for its road injury prevention programme and for being a key partner in the Safer Cars for India project established by Global NCAP, an independent certification body that evaluates the safety of vehicles. Part of IRTE’s strategy has been the setting up of what is believed to be Asia’s first Masters of Science i
  • Speeding Malaysian highway tenders
    September 26, 2023
    Speeding Malaysian highway tender processes
  • ENKA wins award for work on Kosovo highway project
    May 13, 2013
    Turkish contractor ENKA and its joint venture partner Bechtel have won the Best Global Project Award from US magazine Engineering News Record (ENR) for the Kosovo Route 7 highway project. The privately owned firm ENKA and Bechtel won an award in ENR’s Global Best Competition 2013 for the Project of the Year in the category for Roads and Highways around the world. Projects in several categories competed in the awards on factors such as innovation and overcoming global challenges, implementation of safety pro
  • Major Malaysian highway projects in hand
    July 24, 2013
    Malaysia’s Lebuh Raya Pantai Timur 2 (LPT2), highway is expected to open for traffic by September 2014. A series of delays have held back work on the 184km highway, although the 72km Bukit Besi-Kuala Terengganu section has been open since the third quarter of 2011. Some of the delays can be attributed to price increases in the cost of materials, which caused problems for contractors involved with the project. Work is ongoing at present on the section of highway from Bukit Mempusi-Kemamn's Felda Kerteh 6. Me