Skip to main content

Bentley Systems annual infrastructure awards

The annual Year in Infrastructure Awards 2019 run by software specialist Bentley Systems saw a record number of entries, with 571 submissions from 60 countries. Competition was tough, with three finalists being selected by panels of expert judges for the wide range of entry categories.
October 25, 2019 Read time: 2 mins
In the bridge category the team from Wijaya Karya won for their work on the design and build of Harbour Road 2 in Jakarta

There three impressive entries each for both the roads and highways and bridges categories.

For roads and highways these finalists were for BIM applications for the Meitan-Shiqian Expressway in China, the JiHe Expressway in China and the University Road in Cedar Falls, Iowa. Both Chinese expressway projects were enormous in scale and scope, incorporating impressive design features. However, after much deliberation from the judges it was the macro project for the Cedar Falls road improvement that just squeezed past to take first place. Key winning factors included working with the local community, tackling numerous clash detection issues with utilities and using the design model for stringless control of the concrete paver to generate a complex form.

Competition was no less tough in the bridges category, with BIM design in the rapid transformation of the 4th ring road and Dahe Road in Zhengzhou, China, the new viaduct over the Polcevera in Genoa, Italy and the design and build of the Harbour Road 2 project in Jakarta, Indonesia. Again these were all first class projects featuring key innovations in design, engineering and construction. However it was the design and build of the Harbour Road 2 project in Jakarta that won favour, both for its scale and complexity. The judges were impressed with the way BIM had been used to optimise construction, allow the structure to cope with earthquakes measuring up to 9 on the Richter Scale, while also meeting tough environmental requirements.

While the Polcevera Bridge replacement project in Italy did not win in the bridge category itself, it was a winner of a special achievement award. Key factors in this special award included the fact that the bridge’s electrical surveys are powered by solar panels. The project has been fast-tracked through design and construction and the bridge should be in use just two years after the disastrous collapse of the previous structure.

Related Content

  • The environmental case for geosynthetics
    August 8, 2022
    Huesker, a global manufacturer of geosynthetics and technical textiles, explains how incorporating geosynthetic material can boost a project’s environmental credentials*.
  • The use of concrete cutting tools and tips for users
    October 8, 2015
    Despite the proven importance of identifying metal targets and electrical lines before cutting into concrete, every day there are stories about mishaps that happen when the necessary reconnaissance is not done. In this article, a few firms that provide concrete scanning services weigh in on the critical importance of locating embedded and or buried obstructions by scanning for these features using ground penetrating radar (GPR). Also offered are tips for selecting the best GPR equipment and best practices f
  • Software innovations benefit construction planning
    February 9, 2012
    Bentley Systems remains bullish with a healthy financial performance and continued investment in research and development, reports Mike Woof. The State Geological Institute of Dionyz Stur in Slovakia won an award in the Bentley Systems Be Inspired event's geotechnical category for an innovative project to log and analyse an area of the country's geology. As a leading player in the construction software sector, Bentley Systems is benefiting from growth in infrastructure investment worldwide. And despite the
  • New Penang Bridge takes shape
    April 10, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b