Skip to main content

Bentley Systems annual infrastructure awards

The annual Year in Infrastructure Awards 2019 run by software specialist Bentley Systems saw a record number of entries, with 571 submissions from 60 countries. Competition was tough, with three finalists being selected by panels of expert judges for the wide range of entry categories.
October 25, 2019 Read time: 2 mins
In the bridge category the team from Wijaya Karya won for their work on the design and build of Harbour Road 2 in Jakarta

There three impressive entries each for both the roads and highways and bridges categories.

For roads and highways these finalists were for BIM applications for the Meitan-Shiqian Expressway in China, the JiHe Expressway in China and the University Road in Cedar Falls, Iowa. Both Chinese expressway projects were enormous in scale and scope, incorporating impressive design features. However, after much deliberation from the judges it was the macro project for the Cedar Falls road improvement that just squeezed past to take first place. Key winning factors included working with the local community, tackling numerous clash detection issues with utilities and using the design model for stringless control of the concrete paver to generate a complex form.

Competition was no less tough in the bridges category, with BIM design in the rapid transformation of the 4th ring road and Dahe Road in Zhengzhou, China, the new viaduct over the Polcevera in Genoa, Italy and the design and build of the Harbour Road 2 project in Jakarta, Indonesia. Again these were all first class projects featuring key innovations in design, engineering and construction. However it was the design and build of the Harbour Road 2 project in Jakarta that won favour, both for its scale and complexity. The judges were impressed with the way BIM had been used to optimise construction, allow the structure to cope with earthquakes measuring up to 9 on the Richter Scale, while also meeting tough environmental requirements.

While the Polcevera Bridge replacement project in Italy did not win in the bridge category itself, it was a winner of a special achievement award. Key factors in this special award included the fact that the bridge’s electrical surveys are powered by solar panels. The project has been fast-tracked through design and construction and the bridge should be in use just two years after the disastrous collapse of the previous structure.

Related Content

  • Game-changing ideas that deliver daily life and continue to evolve
    December 14, 2016
    As World Highways celebrates its 25-year anniversary this month, we thought that it would be a good moment to take a step back and look at the exciting times we live and work in, and pick out a few of the game-changing new products, technologies and services that have brought about so much innovation in our industry over the past quarter of a century. Where will these new ways of thinking and working take us next? The global highways market has been transformed in the lifetime of World Highways by high-v
  • Romanian road contract awarded
    May 18, 2022
    A major Romanian road contract has been awarded
  • Success of ICOET 2011 event for sustainable roads
    February 23, 2012
    The ICOET 2011 event proved a success for sustainable transportation – *Leonard Sielecki
  • Success of ICOET 2011 event for sustainable roads
    April 12, 2012
    The ICOET 2011 event proved a success for sustainable transportation – *Leonard Sielecki With over 500 delegates from 21 countries, the recent 2011 International Conference on Ecology and Transportation (ICOET) held in Seattle, Washington, USA proved a success. Organised and co-sponsored by the Center for Transportation and the Environment (CTE) at North Carolina State University, and co-hosted by the Washington State Department of Transportation (WSDoT), the five-day conference ran from August 21st-25th