Skip to main content

Bentley Systems annual infrastructure awards

The annual Year in Infrastructure Awards 2019 run by software specialist Bentley Systems saw a record number of entries, with 571 submissions from 60 countries. Competition was tough, with three finalists being selected by panels of expert judges for the wide range of entry categories.
October 25, 2019 Read time: 2 mins
In the bridge category the team from Wijaya Karya won for their work on the design and build of Harbour Road 2 in Jakarta

There three impressive entries each for both the roads and highways and bridges categories.

For roads and highways these finalists were for BIM applications for the Meitan-Shiqian Expressway in China, the JiHe Expressway in China and the University Road in Cedar Falls, Iowa. Both Chinese expressway projects were enormous in scale and scope, incorporating impressive design features. However, after much deliberation from the judges it was the macro project for the Cedar Falls road improvement that just squeezed past to take first place. Key winning factors included working with the local community, tackling numerous clash detection issues with utilities and using the design model for stringless control of the concrete paver to generate a complex form.

Competition was no less tough in the bridges category, with BIM design in the rapid transformation of the 4th ring road and Dahe Road in Zhengzhou, China, the new viaduct over the Polcevera in Genoa, Italy and the design and build of the Harbour Road 2 project in Jakarta, Indonesia. Again these were all first class projects featuring key innovations in design, engineering and construction. However it was the design and build of the Harbour Road 2 project in Jakarta that won favour, both for its scale and complexity. The judges were impressed with the way BIM had been used to optimise construction, allow the structure to cope with earthquakes measuring up to 9 on the Richter Scale, while also meeting tough environmental requirements.

While the Polcevera Bridge replacement project in Italy did not win in the bridge category itself, it was a winner of a special achievement award. Key factors in this special award included the fact that the bridge’s electrical surveys are powered by solar panels. The project has been fast-tracked through design and construction and the bridge should be in use just two years after the disastrous collapse of the previous structure.

Related Content

  • GRAA winner profile: world’s longest suspension bridge has opened in Turkey
    May 3, 2022
    The opening of the majestic 1915 Canakkale Bridge on March 18, 2022, well ahead of its initial schedule, has set new records for Turkey and international bridge engineering. After Istanbul's three bridges over the Bosphorus Strait, Turkey now boasts a fourth bridge connecting Europe and Asia, and the first to span the Dardanelles Strait.
  • Portland bridge deal for HDR
    October 19, 2023
    Consultant HDR has won a key Portland bridge deal.
  • Australia roads alliance
    April 16, 2012
    A huge infrastructure programme is being planned at present for the Australian state of Queensland With an annual growth rate of around 3.2%, Queensland is the fastest growing state in Australia and has been for over a decade. The State attracts an average of 1,500 new permanent residents each week, 1,000 of whom move to the South East corner.
  • Turkey’s new Marmara Highway project
    June 8, 2017
    By the end of 2018, a shiny new strip of asphalt will skirt around Turkey’s largest city, Istanbul, providing a new transport connection.