Skip to main content

Bentley Systems annual infrastructure awards

The annual Year in Infrastructure Awards 2019 run by software specialist Bentley Systems saw a record number of entries, with 571 submissions from 60 countries. Competition was tough, with three finalists being selected by panels of expert judges for the wide range of entry categories.
October 25, 2019 Read time: 2 mins
In the bridge category the team from Wijaya Karya won for their work on the design and build of Harbour Road 2 in Jakarta

There three impressive entries each for both the roads and highways and bridges categories.

For roads and highways these finalists were for BIM applications for the Meitan-Shiqian Expressway in China, the JiHe Expressway in China and the University Road in Cedar Falls, Iowa. Both Chinese expressway projects were enormous in scale and scope, incorporating impressive design features. However, after much deliberation from the judges it was the macro project for the Cedar Falls road improvement that just squeezed past to take first place. Key winning factors included working with the local community, tackling numerous clash detection issues with utilities and using the design model for stringless control of the concrete paver to generate a complex form.

Competition was no less tough in the bridges category, with BIM design in the rapid transformation of the 4th ring road and Dahe Road in Zhengzhou, China, the new viaduct over the Polcevera in Genoa, Italy and the design and build of the Harbour Road 2 project in Jakarta, Indonesia. Again these were all first class projects featuring key innovations in design, engineering and construction. However it was the design and build of the Harbour Road 2 project in Jakarta that won favour, both for its scale and complexity. The judges were impressed with the way BIM had been used to optimise construction, allow the structure to cope with earthquakes measuring up to 9 on the Richter Scale, while also meeting tough environmental requirements.

While the Polcevera Bridge replacement project in Italy did not win in the bridge category itself, it was a winner of a special achievement award. Key factors in this special award included the fact that the bridge’s electrical surveys are powered by solar panels. The project has been fast-tracked through design and construction and the bridge should be in use just two years after the disastrous collapse of the previous structure.

Related Content

  • International Tunnelling Awards 2024
    October 9, 2024
    The International Tunnelling Awards 2024 celebrate excellence in the industry.
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • Building a replacement bridge in record time
    March 13, 2023
    The construction of a new bridge in Pittsburgh, Pennsylvania to replace a collapsed structure has been carried out in record time
  • Bridge of international accord from Russia-China
    May 29, 2018
    A new bridge project joining China and Russia is a sign of international accord between the two nations – Mike Woof writes A new bridge spanning what China calls the Heilongjiang River and which is known as the Amur River in Russia, is a clear sign of an important international accord between the two countries. Discussions over the bridge project were first started between China and Russia in the 1980s, with both nations seeing many changes in leadership since that time. But while the political discussion