Skip to main content

Bentley Systems annual infrastructure awards

The annual Year in Infrastructure Awards 2019 run by software specialist Bentley Systems saw a record number of entries, with 571 submissions from 60 countries. Competition was tough, with three finalists being selected by panels of expert judges for the wide range of entry categories.
October 25, 2019 Read time: 2 mins
In the bridge category the team from Wijaya Karya won for their work on the design and build of Harbour Road 2 in Jakarta

There three impressive entries each for both the roads and highways and bridges categories.

For roads and highways these finalists were for BIM applications for the Meitan-Shiqian Expressway in China, the JiHe Expressway in China and the University Road in Cedar Falls, Iowa. Both Chinese expressway projects were enormous in scale and scope, incorporating impressive design features. However, after much deliberation from the judges it was the macro project for the Cedar Falls road improvement that just squeezed past to take first place. Key winning factors included working with the local community, tackling numerous clash detection issues with utilities and using the design model for stringless control of the concrete paver to generate a complex form.

Competition was no less tough in the bridges category, with BIM design in the rapid transformation of the 4th ring road and Dahe Road in Zhengzhou, China, the new viaduct over the Polcevera in Genoa, Italy and the design and build of the Harbour Road 2 project in Jakarta, Indonesia. Again these were all first class projects featuring key innovations in design, engineering and construction. However it was the design and build of the Harbour Road 2 project in Jakarta that won favour, both for its scale and complexity. The judges were impressed with the way BIM had been used to optimise construction, allow the structure to cope with earthquakes measuring up to 9 on the Richter Scale, while also meeting tough environmental requirements.

While the Polcevera Bridge replacement project in Italy did not win in the bridge category itself, it was a winner of a special achievement award. Key factors in this special award included the fact that the bridge’s electrical surveys are powered by solar panels. The project has been fast-tracked through design and construction and the bridge should be in use just two years after the disastrous collapse of the previous structure.

Related Content

  • Mersey Gateway Bridge has won IABSE’s Outstanding Structure Award
    June 25, 2019
    The UK’s Mersey Gateway Bridge has picked up the Outstanding Structure Award 2019 from IABSE, the International Association for Bridge and Structural Engineering*. Judges described the bridge, designed by Cowi, as "an elegantly integrated solution for a multi-span concrete cable stay bridge in which form follows function". "Everyone involved with the design and construction the Mersey Gateway Bridge over the past six years knows that this is an incredibly special structure,” said Paul Sanders, Cowi’s
  • HDR’s twin Rockingham bridges win PCI award
    February 12, 2021
    The award from the Precast Concrete Institute is a third win for HDR projects.
  • Let’s Boogie in a new tunnel
    July 7, 2020
    The new Victory Boogie Woogie Tunnel will be the most sustainable tunnel in the Netherlands.
  • Mega city transport in Mexico
    June 13, 2012
    Rapid urban growth is resulting in massive mega cities with major transport needs and Mexico City is one of the world’s largest – Mike Woof reports Mexico City is a vast, sprawling metropolis and one of the world’s largest cities, resulting in huge problems for its inhabitants, particularly with regard to infrastructure. Measuring population size is an inexact science for large cities as suburban areas can add to the figures considerably, especially in developing nations where unplanned expansion is as comm