Skip to main content

All change – the evolution of data

Bentley Systems believes that it is on the cusp of a revolutionary step in computing that will boost the working efficiency of companies right across industry. Bhupinder Singh, chief products officer at Bentley Systems explained that its key advance will allow firms to utilise what they already have, but more efficiently.
October 13, 2017 Read time: 4 mins

Embracing change; handling data as an evolutionary process, Mike Woof writes

4019 Bentley Systems believes that it is on the cusp of a revolutionary step in computing that will boost the working efficiency of companies right across industry. Bhupinder Singh, chief products officer at Bentley Systems explained that its key advance will allow firms to utilise what they already have, but more efficiently. He said, “Companies are effectively analysing just 1% of their data. The rest is ‘dark data’ that is stored but not used.”

However, the new iModel 2.0 cloud platform and its first new service, iModelHub, now being introduced by Bentley could deliver a quantum leap. This offers users of the ProjectWise design integration services package the option to speed up the process of going digital.

The existing ProjectWise Design Integration service from Bentley Systems has proven highly successful. This package manages file-based workflows for project delivery and is able to cope with the often disconnected nature of infrastructure project work packaging and collaboration. By adding the new iModelHub package Bentley is benefiting from its partnership with 2794 Microsoft for the Azure cloud services system. The firm claims that this can deliver a connected project that synchronises project changes, and automatically updates a composite project iModel. The system is said to allow for comprehensive and continuous design reviews, highlighting progress and risks in digital workflows.

The iModelHub package tracks project changes on a timeline, and notifies project participants, based on their ProjectWise workflow configuration, about the availability of relevant changes. Users can choose to synchronise from particular timeline milestones, allowing them to understand the impact of ongoing changes.

Keith Bentley, chief technology officer at Bentley Systems provided some context to this launch. He said that in the early 1980s as a student he listened to a presentation on the coming importance of personal computers by one Bill Gates, which influenced him strongly and led to the founding of Bentley Systems. “It was a once in a lifetime experience,” he said, adding that this latest advance will be just as significant. “Not everyone is lucky enough to have two once in a lifetime experiences,” he joked.

Bentley said that the firm has made major progress and explained, “Back in 2009 we introduced iModels.” This delivered a step change and he continued, “It began to be used outside of design.”

Bentley explained that the original iModel 1.0 was basically a container for information. It could be used to store images, 2D and 3D files and a range of other information. However he explained that the iModel 2.0 is also a relational database and said that is advance is about ‘embracing change’.

“Most people think of the cloud as a large supercomputer with almost infinite power.”

Although iModels are now widely used in industry, Bentley said that the way these are utilised leave much to be desired, “The problem is their data is stored by a programmer who has only one intention.”

He continued, “We can’t leave data in this tangled mess. We need to be able to use it. Change is not an inconvenient truth we can ignore.”

The iModelHub offers an efficient solution and he said, “We need a place to store this change. It is not there to store iModels, it is there to store change.”

Rather the containing files in the conventional sense, the iModelHub is the repository of change. Bentley said, “If iModelHub stores the change, where is the master copy? My master copy is the timeline. We have to embrace change. Let’s visualise that change and show what’s different.”

To provide the full range of analytics across multiple projects, and for connected assets, iModel agents can be programmed for each subject. Users can be notified of project-level changes by iModelHub and the system filters updates, providing accessibility of infrastructure engineering model data for compliance and safety. Capacity is less of an issue and he said, “Another important place where iModels are going to be stored is in the cloud.”

The technology is still in development but Bentley said, “We are working on going live with its iModelBridges solution at the beginning of next year.”

He added, “I think it’s the most exciting thing we have ever done.”

For more information on companies in this article

Related Content

  • The radically changing face of UK highways management
    May 14, 2014
    The British Government policy paper ‘Action for Roads: A network for the 21st century’ sets out radical change to the strategic way roads are funded and managed – including plans to turn the Highways Agency into a Government-owned company and a pledge to invest over €33.4 billion (£28 billion) in roads maintenance between 2015 and 2020. Jenny Moten, Highways Agency divisional director for Network Services, gave a keynote presentation on the new approach to strategic highways management during the Road Safet
  • Earthmoving machines the backbone of construction
    February 7, 2012
    Earthmoving machines remain the backbone of construction operations - writes Mike Woof. ADTs, excavators and wheeled loaders play pivotal roles in most construction jobs with the earthmoving stage providing a key component of most projects.
  • Hollco’s RadioConnect2 portable traffic light system goes live
    January 8, 2019
    Portable traffic light manufacturer Hollco has delivered the first of its new RadioConnect2 (RC2) system. The RadioConnect2 went to Go Traffic Management which helped contribute to the development of RadioConnect2, said Phil Hutchinson, a director of Hollco, based in England. “By focusing on energy efficiency we have improved run times to up to 18 days without the need for battery replacement or recharging. This will generate significant savings for operators by reducing the frequency of site visits. It wi
  • UK contractor operating sophisticated Benninghoven asphalt plant
    April 27, 2015
    A sophisticated Benninghoven asphalt plant is now in use by a UK contractor close to London - Mike Woof writes UK contractor FM Conway is now operating a second highly advanced asphalt plant in the London area. As with the first unit supplied a few years ago, the plant was designed and constructed to FM Conway’s specific needs by leading producer Benninghoven. This latest plant is located to the west of London (the earlier plant is to the east of the city) and close to Heathrow Airport. Being situated