Skip to main content

Topcon machine control units take the heat off an Alaskan contractor

Juniper, spruce, cranberry, cottonwood and rose. Most people think of pine trees and berries amid beautiful country fields. But for one contractor based just below the Arctic Circle in the US state of Alaska, the names represent a successful job completed using machine control. Valley General Construction recently finished a US$350,000 contract for the upgrading of country roads in the local borough of Matanuska-Susitna. The colourful names belong to roads in a heavily wooded residential subdivision located
December 4, 2015 Read time: 4 mins
Machine control systems helped boost project quality in Alaska
Juniper, spruce, cranberry, cottonwood and rose. Most people think of pine trees and berries amid beautiful country fields. But for one contractor based just below the Arctic Circle in the US state of Alaska, the names represent a successful job completed using machine control

Valley General Construction recently finished a US$350,000 contract for the upgrading of country roads in the local borough of Matanuska-Susitna. The colourful names belong to roads in a heavily wooded residential subdivision located in the borough, not far from the town of Palmer, population about 6,500.

Valley is a medium-to-small size contractor – up to eight employees – based in Palmer. Local roadwork and commercial projects are the bulk of the business but the company also works at times in Anchorage, only about 70km away and – with a population of about 300,000 –is the state’s largest city.

In 2014, the Matanuska-Susitna Borough decided on a two-year plan to upgrade the subdivision’s dirt roads that are laid out in a grid pattern, roughly square and with a total length of 1.5km. The objective for year one is to raise the embedded dirt roads to grade and then let them “winter over” – settle down – so that in year two they can be paved.

“Since the roads are embedded below grade, there have been major drainage problems,” stated Brian Hooks, project manager and co-owner of Valley General Construction. “We needed to bring the road not only up to grade but also build in a culvert to address the water run off.”

The borough’s engineers produced CAD drawings showing the 3.6m-wide roads, culverts almost a metre wide and the cut-ins for 50 driveway approaches.

“I took the engineers’ drawings and used 342 Topcon MAGNET Office Site to create a site model and files that could control the excavator and dozer we used on the project,” said Hooks.

But Hooks first needed to upgrade an older and limited machine control system so he consulted GPS Alaska, based in Anchorage, and received additional training and help to select a robust system for the company’s 178 Caterpillar dozer. Valley General purchased the Topcon 3D-MC2 machine control designed to access all satellites and provide position updates up to 100 times per second.

The 3D-MC2 sensor combines a gyro, compass and inertial sensor to measure the X, Y and Z positions as well as the roll, pitch, yaw and acceleration of the dozer. The Topcon system connects to both GPS and GLONASS satellites.

Additionally, Valley purchased a Topcon X62 excavator grade control system for its 233 Hitachi ZX210-6 hydraulic excavator that has an operating weight of 21,900kg and a bucket force of 158kN. The project was also the first job where Valley had used machine control technology on an excavator.

The embedded roads were already several inches below grade. Excavation brought each road to a uniform 10 inches below grade before lifts of fill soil, crushed stone and a binder-layer of reclaimed asphalt pavement – RAP – were added.

Once completed, the roads will winter over until next spring. Alaskan winters are long so the borough wants to adjust the roads after the several freeze-thaw cycles that can occur during a winter season before a finished asphalt surface is paved.

The subdivision project required about 3,060m3 of fill dirt and nearly 6,120m3 of #5 crushed stone. Additionally, 76m of culvert pipe was laid down. “We completed in two weeks,” said Hooks. “Our accuracy is spot on, so we’ve eliminated wasted time with rework.”

Without machine control technology, the job would have taken twice as long and had more risks of delays.

Hooks said Valley’s machine operators can literally go out on to the job and know, by looking at their monitors, what needs to be done. “The project is stake-less, so we don’t need surveyors or have delays when a stake is run over. Plus, we also eliminated the need for a worker to walk along with the excavator for spotting and checks,” he said.

“We’ve been using the technology for so long, it’s hard to imagine running a project without it. If someone took it away, people would walk out the door…probably following me, it’s that important.”

For more information on companies in this article

Related Content

  • Efficient, accurate asphalt compaction technology
    February 14, 2012
    The efficiency of asphalt compaction performance has improved immeasurably in recent years with the development of more effective equipment. Manufacturers have honed the designs of the machines, making them easier and more comfortable to operate, improving visibility and also tackling issues such as maintenance downtime by making the equipment more reliable and quicker to service. However one of the biggest advances in compaction performance has come not from the machines, but from the control and measur
  • Testing and striping underway for Seattle’s Alaskan Way tunnel
    October 18, 2018
    Crews have been working flat out on the Alaskan Way Tunnel in Seattle to install and test thousands of components and 90 interconnected systems.The client, Washington State Department of Transportation, said that Seattle Tunnel Partners began installation inside the double-deck State Route 99 tunnel in March after crews completed construction of the upper and lower roadways. STP said that testing could be complete by late September and the tunnel could open as soon as this fall after an approximate three-w
  • Bitumen tech: innovation for decarbonisation
    June 4, 2024
    Kristina Smith examines four new products and processes, including bio-bitumen produced from algae, designed to lower the carbon footprint of asphalt mixes.
  • Innovations in concrete paving offering improved surfaces
    July 17, 2017
    Major innovations in concrete paving systems will offer customers improved surface finishes - Mike Woof writes US manufacturers continue to dominate the concrete paving sector, with German firm Wirtgen being the only exception. A number of Chinese manufacturers have attempted to enter the concrete paving market with compact machines but have so far had little success in tempting customers away from proven brands. The expertise in for the niche segment of concrete paving remains the preserve of a handful