Skip to main content

Tag option

While the use of GPS is now commonplace in industry there are locations that do not get a reliable signal throughout the working day. The location, geographical layout and depth of a quarry can cause 'canyoning', where GPS signals are not dependable.Poor signals make GPS-based machine tracking technology unreliable but a Canadian firm has an RFID-based system it believes could be the answer for such sites. This cost effective QuarryTag system has been adapted from a product that has been widely used by the
February 20, 2012 Read time: 2 mins
While the use of GPS is now commonplace in industry there are locations that do not get a reliable signal throughout the working day. The location, geographical layout and depth of a quarry can cause 'canyoning', where GPS signals are not dependable.

Poor signals make GPS-based machine tracking technology unreliable but a Canadian firm has an RFID-based system it believes could be the answer for such sites. This cost effective QuarryTag system has been adapted from a product that has been widely used by the road paving market since 2007.

"QuarryTag was launched in March last year after one of our customers in North America asked for the PaveTag system to be adapted for its quarry operation," explained 2858 Minds regional sales manager Curtis Kieres. "The customer had tried GPS solutions but the signals at the site were not reliable enough. The company was already aware of the system for the road construction sector so asked for a similar solution."

"The issue for many road and quarry operators is that the trucks are often owned by haulers so they won't invest in GPS receivers. The RFID tags used by both QuarryTag and PaveTag cost around US$40 and are very easy and cheap to install." Kieres explained that the PaveTag system works on the basis of a moving geofence but the QuarryTag solution is simpler as the site is not continually moving. "QuarryTag does not use cellular or satellite networks but uses wifi to link the information from the trucks to the weigh station or office," he said.

The quarry, which has now been using the system for over a year, was the first customer to use the system and reported that any percentage of efficiency gain in the cycle times was significant to its business due to the hourly costs of running the hauling fleet. It also allows the operator to check the productivity of each driver or truck. "The information can be analysed through a web-based portal called E-Routes that can provide customised reports and alerts for operators," explained Kieres.

For more information on companies in this article

Related Content

  • Asphalt milling and paving with 3D control
    February 16, 2012
    Milling and paving repair operations for airport runways require particularly high tolerances, an obvious market for 3D control solutions writes Mike Woof. Airport runways require some of the most accurate quality standards and tightest tolerances of any asphalt or concrete surface. This is one area where the high precision capabilities of 3D systems offer clear advantages.
  • Bridge inspection: destructive versus non-destructive methods
    January 6, 2015
    Tens of thousands of bridges in the United States are in desperate need of repair. But where to begin analysing their deteriorating state? Roger Roberts* investigates tips and techniques for ensuring bridge safety The average age of America’s more than 600,000 crumbling bridges is 42 years – many are 60 to 80 years old. The situation is dire, with many described as functionally obsolete, according to the American Society of Civil Engineers’ latest edition of its Report Card for America’s Infrastructure.
  • Compact and efficient drilling
    February 22, 2012
    Using MOBA MDS-2000 drilling system controls to monitor blast hole drilling in a limestone quarry is helping ensure optimum accuracy.
  • Caterpillar Paving offers a guide to efficient night time paving practices
    October 3, 2014
    Efficient night-time paving operations can reduce construction costs and cut traffic delays - *Todd Mansell writes As roads become more congested, the user cost of daytime lane closures to accommodate road construction and paving has increased dramatically. One solution to lower user costs associated with traffic delays is to carry out more paving at night during off-peak times. However night-time paving brings new challenges to producing quality work in safely.