Skip to main content

Silver Star marries a Topcon GPS system to a Power Curber 5700-C

In the US state of Oklahoma, Silver Star Construction has adopted 3D technology for site modelling and stringless machine control The company, based in the town of Moore, recently used a Topcon Millimeter GPS system mounted on one of their Power Curber 5700-Cs to put down nearly 5,500m of curb and gutter in a residential housing addition in south-west Oklahoma City. Once the dirt work and grading was completed, the concrete crew got to work by mounting the Topcon receivers on their 5700-C. The Topcon
January 19, 2016 Read time: 2 mins
The precision of the curb placement can easily be seen from above
In the US state of Oklahoma, Silver Star Construction has adopted 3D technology for site modelling and stringless machine control

The company, based in the town of Moore, recently used a 342 Topcon Millimeter GPS system mounted on one of their Power Curber 5700-Cs to put down nearly 5,500m of curb and gutter in a residential housing addition in south-west Oklahoma City.

Once the dirt work and grading was completed, the concrete crew got to work by mounting the Topcon receivers on their 5700-C. The Topcon unit received the signal from the laser transmitter and set up the Topcon rover to check the vertical and horizontal position of the curb.
With a good concrete mix and steady delivery, the Silver Star crew was able to pour about 1,220m of curb and gutter per day without having to set and remove any stringline.

“It’s very hard for a crew that has set stringline their whole life to watch the machine just take off and follow the 3D guidance,” said Louis Cossey of Silver Star. “For a few times at first we set some stakes just to make ourselves feel better because it’s always been on grade. The advantages of stringless are overwhelming, such as cutting labour costs in half.”

Silver Star does their own 3D modelling to ensure that the model is in correct vertical and horizontal alignment for pouring curb.

“It’s a very basic system once you understand it. Anyone can learn it; it just takes a little time,” said Cossey. “3D is the future and we have several systems. If you’re going to compete in the construction world today, you need a control system. GPS is here to stay and it is constantly changing for the better.”

Over the past 30 years from its founding by one man and a dump truck, Silver Star has accumulated more than 400 machines, including graders and asphalt equipment, dozers, excavators, pavers and slipform machines.

For more information on companies in this article

Related Content

  • Topcon unveils Hybrid Robotic System
    January 21, 2014
    Topcon Positioning Group has unveiled its Hybrid Robotic System, featuring the new DS series robotic total station and the recently announced MAGNET v2.0 software suite, a Topcon enterprise solution for the geomatics industry. Other Topcon components in the cutting-edge HRS include the economical HiPer SR GNSS receiver and Tesla large-screen tablet controller. The new system combines GNSS positioning and robotic measurements with an automated data workflow to provide added versatility and efficiency for
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • Tunnelling challenge on German project
    June 13, 2012
    A massive construction project has been underway deep in the heart of the Schnecktal valley area in Germany. From the surface, though, you would never be able to tell. The majority of the work is underground, as a joint-venture team led by German contractor Wayss and Freytag Ingenieurbau builds the nearly 7km long Finne Tunnel. After a few years of tunnel boring operations, the contractor is at work finishing the interior of the tunnel, slipforming first the tunnel’s floor and then a walkway with its GOMACO
  • Delivering the smoothest road surfaces
    May 26, 2021
    Roads and highways have to be monitored and maintained regularly to ensure they are safe for use, and surface smoothness is a key factor for road quality. However, for racetracks (and airport runways) surface smoothness is even more important for safety and performance