Skip to main content

Silver Star marries a Topcon GPS system to a Power Curber 5700-C

In the US state of Oklahoma, Silver Star Construction has adopted 3D technology for site modelling and stringless machine control The company, based in the town of Moore, recently used a Topcon Millimeter GPS system mounted on one of their Power Curber 5700-Cs to put down nearly 5,500m of curb and gutter in a residential housing addition in south-west Oklahoma City. Once the dirt work and grading was completed, the concrete crew got to work by mounting the Topcon receivers on their 5700-C. The Topcon
January 19, 2016 Read time: 2 mins
The precision of the curb placement can easily be seen from above
In the US state of Oklahoma, Silver Star Construction has adopted 3D technology for site modelling and stringless machine control

The company, based in the town of Moore, recently used a 342 Topcon Millimeter GPS system mounted on one of their Power Curber 5700-Cs to put down nearly 5,500m of curb and gutter in a residential housing addition in south-west Oklahoma City.

Once the dirt work and grading was completed, the concrete crew got to work by mounting the Topcon receivers on their 5700-C. The Topcon unit received the signal from the laser transmitter and set up the Topcon rover to check the vertical and horizontal position of the curb.
With a good concrete mix and steady delivery, the Silver Star crew was able to pour about 1,220m of curb and gutter per day without having to set and remove any stringline.

“It’s very hard for a crew that has set stringline their whole life to watch the machine just take off and follow the 3D guidance,” said Louis Cossey of Silver Star. “For a few times at first we set some stakes just to make ourselves feel better because it’s always been on grade. The advantages of stringless are overwhelming, such as cutting labour costs in half.”

Silver Star does their own 3D modelling to ensure that the model is in correct vertical and horizontal alignment for pouring curb.

“It’s a very basic system once you understand it. Anyone can learn it; it just takes a little time,” said Cossey. “3D is the future and we have several systems. If you’re going to compete in the construction world today, you need a control system. GPS is here to stay and it is constantly changing for the better.”

Over the past 30 years from its founding by one man and a dump truck, Silver Star has accumulated more than 400 machines, including graders and asphalt equipment, dozers, excavators, pavers and slipform machines.

For more information on companies in this article

Related Content

  • Sophisticated machine control solution from Topcon
    June 1, 2022
    Topcon Positioning says that its new MC-Max machine control solution is a scalable solution for use with mixed-fleets of heavy equipment.
  • Wirtgen now offers a sophisticated 3D paver control system
    January 6, 2017
    Wirtgen is introducing its latest AutoPilot Field Rover system which allows fully automatic, stringline-free concrete paving and allows jobs to be carried out more easily, quickly and economically. The system is more efficient than using conventional stringlines and is faster also and its 3D control system comprises a computer integrated into the machine and a control panel. Two GPS receivers mounted on the machine communicate with a GPS reference station on the job site. A digital terrain model is not requ
  • Wirtgen now offers a sophisticated 3D paver control system
    January 30, 2013
    Wirtgen is introducing its latest AutoPilot Field Rover system which allows fully automatic, stringline-free concrete paving and allows jobs to be carried out more easily, quickly and economically. The system is more efficient than using conventional stringlines and is faster also and its 3D control system comprises a computer integrated into the machine and a control panel. Two GPS receivers mounted on the machine communicate with a GPS reference station on the job site. A digital terrain model is not requ
  • A machine from Power Curbers has carried out productive barrier slipforming work
    January 4, 2013
    A contractor in the US has used a slipformer from Power Curbers to carry out a barrier installation project. The firm, Wisconsin-based Choice Construction, used slipforming machines from Power Curbers for the project. The worksite was located along Wisconsin State Highway 41, between Oshkosh and Green Bay along the west side of Lake Winnebago. The project entailed widening the highway from two to three lanes and adding barrier wall between the north and southbound lanes. Because the job has a number of di