Skip to main content

Silver Star marries a Topcon GPS system to a Power Curber 5700-C

In the US state of Oklahoma, Silver Star Construction has adopted 3D technology for site modelling and stringless machine control The company, based in the town of Moore, recently used a Topcon Millimeter GPS system mounted on one of their Power Curber 5700-Cs to put down nearly 5,500m of curb and gutter in a residential housing addition in south-west Oklahoma City. Once the dirt work and grading was completed, the concrete crew got to work by mounting the Topcon receivers on their 5700-C. The Topcon
January 19, 2016 Read time: 2 mins
The precision of the curb placement can easily be seen from above
In the US state of Oklahoma, Silver Star Construction has adopted 3D technology for site modelling and stringless machine control

The company, based in the town of Moore, recently used a 342 Topcon Millimeter GPS system mounted on one of their Power Curber 5700-Cs to put down nearly 5,500m of curb and gutter in a residential housing addition in south-west Oklahoma City.

Once the dirt work and grading was completed, the concrete crew got to work by mounting the Topcon receivers on their 5700-C. The Topcon unit received the signal from the laser transmitter and set up the Topcon rover to check the vertical and horizontal position of the curb.
With a good concrete mix and steady delivery, the Silver Star crew was able to pour about 1,220m of curb and gutter per day without having to set and remove any stringline.

“It’s very hard for a crew that has set stringline their whole life to watch the machine just take off and follow the 3D guidance,” said Louis Cossey of Silver Star. “For a few times at first we set some stakes just to make ourselves feel better because it’s always been on grade. The advantages of stringless are overwhelming, such as cutting labour costs in half.”

Silver Star does their own 3D modelling to ensure that the model is in correct vertical and horizontal alignment for pouring curb.

“It’s a very basic system once you understand it. Anyone can learn it; it just takes a little time,” said Cossey. “3D is the future and we have several systems. If you’re going to compete in the construction world today, you need a control system. GPS is here to stay and it is constantly changing for the better.”

Over the past 30 years from its founding by one man and a dump truck, Silver Star has accumulated more than 400 machines, including graders and asphalt equipment, dozers, excavators, pavers and slipform machines.

For more information on companies in this article

Related Content

  • It's all about profit, people and the planet
    February 18, 2025
    Sit in on our latest roundtable discussion on sustainability in the construction and aggregates industries, brought to you by Global Highways and Aggregates Business. AB editor Guy Woodford has been talking to two world-class experts: Jeremy Harsin from Cummins and Michael Gomes from Topcon. Make your planning, your workflows, your contract tenders, and your sites as sustainable as possible. “Sustainability is really about profit, people and the planet,” say our experts. “Being able to drive that is the work that matters.”
  • Accurate concrete paving with Wirtgen
    January 7, 2024

    Wirtgen’s improved stringless concrete paving system is being used on the A43 highway near Münster in Germany. 
    The AutoPilot 2.0 is a 3D control system that helps increase efficiency and safety. The system is being used to deliver a new poured in-place concrete safety barrier that will separate the eastbound and westbound lanes of the A 43 Autobahn.

  • Low temperature asphalt and aggregate options’
    February 7, 2014
    At what point does ‘some technology’ become ‘enough technology’? Less than four years ago industry publications were filled with a persistent message, the reluctance of UK based contractors to adopt machine control to the same extent as near European neighbours, particularly close ones such as Ireland and Holland. However from 2009 onwards we have seen a huge shift in demand for machine control as the success of high profile road and rail jobs such as the M25 widening scheme and Airdrie – Bathgate rail
  • No strings attached: a Wirtgen SP 15i in Mobile
    May 9, 2019
    A Wirtgen slipform paver SP 15i operated fully automatically to produce kerbs near Mobile, in the US state of Alabama, as the company explains. When a new residential area is developed, the individual contract work sections are often very detailed. Roads and paths have to be paved and access roads to the individual plots constructed. Various traffic areas are often separated by concrete structures such as kerbs. These kerbs can be either pre-cast parts or monolithic profiles produced right on the job sit