Skip to main content

Profiling software assesses driver risk factors

The UK's Royal Society for the Prevention of Accidents (RoSPA) is now offering an updated version of its Driver Profiler package. Called Driver Profiler 20:20, this package is designed to assess whether a driver is a low, medium or high-risk by measuring psychometric, demographic and behavioural factors that influence safety. Using the package allows firms to identify drivers in need of further training and make informed decisions as to what is required. The system makes it possible to target specific train
February 9, 2012 Read time: 2 mins

The UK's 2518 Royal Society for the Prevention of Accidents (RoSPA) is now offering an updated version of its Driver Profiler package.

Called Driver Profiler 20:20, this package is designed to assess whether a driver is a low, medium or high-risk by measuring psychometric, demographic and behavioural factors that influence safety. Using the package allows firms to identify drivers in need of further training and make informed decisions as to what is required. The system makes it possible to target specific training at those who need it most and many of the improvements are based on feedback from existing customers. The updated package features a short question set, just 45 questions in all, which only take 10 minutes to complete. The questions also take into account new technologies such as satellite navigation and hands-free mobile phones.

Questions, combining known risk factors with driver attitude factors, are now more closely tailored to occupational driver risk, focusing on fatigue, driving under pressure and work distractions. The software is also said to be more user friendly with tailored feedback for every question answered as well as an overall risk rating. On completion the driver receives the report instantly, while an inbuilt consistency checker ensures that accurate reports are produced. Managers are able to access reports showing who is at risk and why, and are able to export data into a spreadsheet, tailoring the results to their specific requirements. Organisations can also opt for a fully or part-managed service from RoSPA, taking the administration out of risk assessment. This may include RoSPA sending out assessments on a company's behalf, or the collection of additional information.

For more information on companies in this article

Related Content

  • Rapid adoption of GPS machine control
    February 10, 2012
    The high sophistication of GPS machine control systems has resulted in a fast pace of technological advancement. The three major players in the machine control sector, Leica Geosystems, Topcon and Trimble have all made major gains in recent years. The sophistication of the latest systems can combine satellite position data from the GPS and GLONASS networks with information from total stations to provide precise, high speed machine operation. Further more the firms have also prepared themselves for the intro
  • Intersection dangers for drivers
    October 12, 2023
    Intersections are dangerous for drivers.
  • Show me the money at Australian Summit
    September 4, 2012
    The question of how to finance and fund major road infrastructure projects in Australia – including the potential role of user-pays charging as a funding solution – was top of mind at the recent Roads Australia National Summit in Sydney. The two-day summit, organised by peak national body Roads Australia, is the largest and most influential annual gathering of industry decision-makers in the country. This year’s summit was held against a backdrop of concern over the future of a raft of major road projects t
  • The use of telematics in construction machines is growing
    May 20, 2015
    Demand for telematics technology is growing, as equipment users begin to lean the value of these systems – Alan Dron reports With construction projects increasingly operating to wafer-thin profit margins, any technological assistance that can keep the accounts in the black is welcome. This is particularly the case with those projects where contractors can share a larger slice of the profits if they complete their work ahead of schedule. The downside, of course, is that they also share the pain if the