Skip to main content

Foth Uses Collaborative Digital Engineering to Deliver Road Infrastructure Project

Foth utilised software from Bentley Systems to improve safety and traffic flow on an urban road stretch in Iowa.
June 1, 2020 Read time: 3 mins

A Massive Modernisation Initiative

Located in Cedar Falls, Iowa, University Avenue is a six-lane divided highway supporting more than 20,000 vehicles/day. Built over 60 years ago, the corridor was suffering from deteriorated pavement, a high crash rate, and inefficient traffic operations, as well as lacking pedestrian and bicycle accommodations. To improve roadway conditions and FOTH 1traffic flow, provide non-vehicular access, and spur economic growth, Cedar Falls initiated a US$38.9 million revitalisation. Foth was hired to develop a comprehensive transportation plan for the roadway, from preliminary engineering through final design and construction. Faced with technical, engineering, and coordination challenges—compounded by aggressive timelines and intense public involvement—the organisation required integrated digital applications to meet city and stakeholder demands.

Coordinated Digital Workflows

With 100 members in seven offices working together for over five years, it was important that Foth have the right communication and design applications. Working closely with the city, Foth set out to help it realise the goals using Bentley’s open BIM and reality modeling applications. The team used multiple data acquisition capabilities, including drone and mobile scanning for fast accurate data collection. Collaboration and effective sharing of the models and engineering data were critical to meeting the aggressive schedule and developing a cost-effective design. Bentley’s open applications streamlined workflows and facilitated coordinated design to meet these timelines. The integrated digital platform helped teams remotely manage data and bring consistency in document management and engineering processes, while also providing traceability for design change management to diagnose and remediate issues within hours instead of weeks.

Bentley FOTH2Maximising Model Potential

Foth created multidiscipline 3D models and analysed numerous design alternatives to deliver a “living street” that strengthened the local economy. Having a single 3D model improved the accuracy and efficiency of the design process, seamlessly integrating designers and consultants from a global network. The model helped the team coordinate with 11 public and private utilities to relocate underground and overhead infrastructure in advance of construction, including adjustments for over 2 miles of major communication facilities. Using the 3D model helped align all parties to identify and visualise clashes while also reducing risk of delays during construction. Foth also extended its digital engineering model to optimise client review and approval processes, public involvement, and construction bidding. The team used LumenRT and MicroStation to create an animated virtual representation of the corridor model. These representations helped Cedar Falls visualise corridor improvements and traffic patterns, demonstrating design intent to ensure project buy-in and approvals.

Digital Solutions Drive Transformation

Bentley FOTH 3The 3D models and information-rich visualisations facilitated accurate communication of design alternatives to stakeholders and the public to accommodate the aggressive project schedule. Using open applications reduced the design phase by 50%, saving 1,600 hours of design time which enabled construction to begin a full year ahead of schedule. Including the BIM model as part of the bidding documents ultimately resulted in costs at 3% below total contract bid amounts, saving the city more than US$500,000. Foth established the 3D model as a digital twin, with data flowing to and from the model enabling field personnel to quickly identify and resolve potential issues on site. Foth’s safe, efficient, and modern design delivered a return on investment estimated at US$32 million in savings for the community to be realised over the next 25 years.

Click here to learn more


Sponsored content produced in association with Bentley Systems

 

For more information on companies in this article

Related Content

  • BOMAG’s new asphalt paver range
    June 23, 2021
    BOMAG is launching its new range of asphalt pavers, which benefit from the latest technology. The new generation of universal and highway class pavers from BOMAG are equipped with the company’s Advanced Pave system, a digital co-pilot for pavers
  • ULMA engineering solutions on the emblematic Arch of Innovation bridge, Brazil
    June 21, 2020
    The arch of innovation is a cable-stayed bridge that will connect Zarur, São João, and Cassiano Ricardo avenues in São Paulo, Brazil. With a height of 100m, it has become one of the most iconic bridges in the country of its type, given its peculiar arc shape.
  • New Bocimi Toll Road Aims to Reduce Travel Time and Boost Indonesia’s Economy
    April 20, 2023
    The Bogor-Ciawi-Sukabumi (Bocimi) toll road is a series of national strategic projects to help reduce traffic congestion along the existing factory-lined roadway, as well as enhance regional connectivity and tourism in West Java. Spanning 54 kilometers, the new highway corridor is expected to shorten travel time between the Bogor and Sukabumi provinces from two hours to 30 minutes and boost economic conditions in the surrounding Sukabumi area. Construction is divided into four phases, the first of which measures 15.35 kilometers and is already complete. PT Waskita Karya (Waskita) is the main contractor for the IDR 2.1 trillion second section, spanning 11.9 kilometers between Cigombong and Cibadak, and set for completion in 2023 after being delayed due to the pandemic.
  • Cultivate better on-site safety awareness by leveraging technology with Leica Geosystems
    August 10, 2023
    When a vital fiber-optic cable was cut during construction work in Germany, the impact was huge. There were telecom disruptions affecting the greater Frankfurt area, all departures and landings at Frankfurt Airport were suspended, and Lufthansa’s global IT system crashed. Leica Geosystems says it is vital to put in place “strategies to protect people, equipment, and assets… and to emphasise the crucial role digital solutions play in ensuring safety.”