Skip to main content

Foth Uses Collaborative Digital Engineering to Deliver Road Infrastructure Project

Foth utilised software from Bentley Systems to improve safety and traffic flow on an urban road stretch in Iowa.
June 1, 2020 Read time: 3 mins

A Massive Modernisation Initiative

Located in Cedar Falls, Iowa, University Avenue is a six-lane divided highway supporting more than 20,000 vehicles/day. Built over 60 years ago, the corridor was suffering from deteriorated pavement, a high crash rate, and inefficient traffic operations, as well as lacking pedestrian and bicycle accommodations. To improve roadway conditions and FOTH 1traffic flow, provide non-vehicular access, and spur economic growth, Cedar Falls initiated a US$38.9 million revitalisation. Foth was hired to develop a comprehensive transportation plan for the roadway, from preliminary engineering through final design and construction. Faced with technical, engineering, and coordination challenges—compounded by aggressive timelines and intense public involvement—the organisation required integrated digital applications to meet city and stakeholder demands.

Coordinated Digital Workflows

With 100 members in seven offices working together for over five years, it was important that Foth have the right communication and design applications. Working closely with the city, Foth set out to help it realise the goals using Bentley’s open BIM and reality modeling applications. The team used multiple data acquisition capabilities, including drone and mobile scanning for fast accurate data collection. Collaboration and effective sharing of the models and engineering data were critical to meeting the aggressive schedule and developing a cost-effective design. Bentley’s open applications streamlined workflows and facilitated coordinated design to meet these timelines. The integrated digital platform helped teams remotely manage data and bring consistency in document management and engineering processes, while also providing traceability for design change management to diagnose and remediate issues within hours instead of weeks.

Bentley FOTH2Maximising Model Potential

Foth created multidiscipline 3D models and analysed numerous design alternatives to deliver a “living street” that strengthened the local economy. Having a single 3D model improved the accuracy and efficiency of the design process, seamlessly integrating designers and consultants from a global network. The model helped the team coordinate with 11 public and private utilities to relocate underground and overhead infrastructure in advance of construction, including adjustments for over 2 miles of major communication facilities. Using the 3D model helped align all parties to identify and visualise clashes while also reducing risk of delays during construction. Foth also extended its digital engineering model to optimise client review and approval processes, public involvement, and construction bidding. The team used LumenRT and MicroStation to create an animated virtual representation of the corridor model. These representations helped Cedar Falls visualise corridor improvements and traffic patterns, demonstrating design intent to ensure project buy-in and approvals.

Digital Solutions Drive Transformation

Bentley FOTH 3The 3D models and information-rich visualisations facilitated accurate communication of design alternatives to stakeholders and the public to accommodate the aggressive project schedule. Using open applications reduced the design phase by 50%, saving 1,600 hours of design time which enabled construction to begin a full year ahead of schedule. Including the BIM model as part of the bidding documents ultimately resulted in costs at 3% below total contract bid amounts, saving the city more than US$500,000. Foth established the 3D model as a digital twin, with data flowing to and from the model enabling field personnel to quickly identify and resolve potential issues on site. Foth’s safe, efficient, and modern design delivered a return on investment estimated at US$32 million in savings for the community to be realised over the next 25 years.

Click here to learn more


Sponsored content produced in association with Bentley Systems

 

For more information on companies in this article

Related Content

  • Topcon: A revolution in construction technology’s coming
    July 7, 2021
    The construction equipment industry is at a turning point. Topcon’s senior leaders believe that we are about to see a huge surge in the adoption of new construction technologies. The time is ripe as a new, younger and more tech-savvy generation comes to the fore. Governments could save billions, and where does the smartphone fit in?
  • Customer Comes Full Circle with Komatsu iMC 2.0
    April 4, 2022
    In 2017, the Budorealizacja company from Myślenice, Poland started using the first ever Komatsu intelligent Machine Control (iMC) excavator to be delivered in the country. Over four years on, the company now owns 10 Komatsu iMC machines across both excavators and dozers, and significantly, its fleet was further expanded when they recently became the first Polish customer to take delivery of an iMC 2.0 version of the PC210LCi-11
  • Nuphalt is well-prepared to meet the growing challenge for road repairs
    November 21, 2023

    2023 is proving to be a great year for the Nuphalt Group. Beginning in January with a move into their brand-new, purpose-built facility in Rugby, UK, utilising new mezzanine floors (increased manufacturing space by 50%), adding state-of-the-art laser cutting equipment and, of course, bringing everything under one roof. And with 100 kW of PV solar power up there, that’s no ordinary roof! The move to a more self-sufficient premises is all part of Nuphalt’s vision for a greener future.

  • Making machines last another generation
    October 1, 2023
    The shift toward a circular economy approach is key to the transition towards net zero carbon emissions. At Volvo Construction Equipment (Volvo CE), keeping construction machines – and their parts – in action for longer, to maximise their useful life, is a core part of its sustainability ambitions.