Skip to main content

Bentley’s OpenBridge for Cebu-Cordova link

The OpenBridge software solution from Bentley Systems played a key role in the development of the Cebu-Cordova bridge project in the Philippines.
February 7, 2024 Read time: 4 mins
The OpenBridge solution, by Bentley, features automated post-processing that helped reduce time and costs on the Cebu-Cordova Link Expressway by almost 30% (image courtesy of SENER)

The tolled Cebu-Cordova Link Expressway is a bridge and causeway stretching almost 9km across the Mactan Channel, making it the Philippines’ longest and tallest bridge. It connects the city of Cebu, which has nearly one million inhabitants within the greater Central Visayas area, to the smaller municipality of Cordova, around 75,000 people on the island of Mactan.

Before the four-lane, 27m-wide expressway opened in 2022, Cebu was connected to Mactan by only two bridges to the north. This third inter-island connection to the south is relieving traffic congestion on the two original bridges and improving regional tourism and the economy. Importantly, the expressway has reduced travel time between Mactan Island and Cebu International Airport by 40 minutes.

As part of a temporary design joint venture, SENER, a private engineering and technology group founded in Spain in 1956, led detailed engineering design, managed the multi-organisational design teams and provided technical assistance during construction. The overall project features several bridges and access viaducts connecting to the main cable-stayed bridge, explained Jordi Revoltós, bridges and viaducts discipline head at SENER.

The project presented several challenges, including extreme seismic conditions and an extremely sensitive marine environment. The area is prone to typhoons with winds as strong as 250kph. On top of this, with design teams across multiple organisations working on the project, SENER faced design compatibility issues when connecting the viaducts to the main bridge structure.

X-HEAD: Effective interaction

“Since the approach viaducts connect with support at the mid-span of the bridge, special coordination [needed to be] developed to ensure a joint and compatible design,” said Revoltós. Effective interaction was a key factor in obtaining a balanced design.

Another challenge was that the project needed to be constructed entirely over water on a tight timeline. This complex construction sequence required software that could integrate with all design parameters to develop models that incorporated modifications from the construction site. SENER realised that they needed flexible, interoperable bridge modeling software. “An [unsuitable] choice of calculation software [would lead to] increased time and costs during the design phase, while jeopardising final approvals needed before construction,” said Revoltós.

SENER selected Bentley’s OpenBridge solution because of its flexibility, collaborative design capabilities and automated calculation features. “The high flexibility of OpenBridge to develop models with modifications requested from the construction site, together with the short time required to adapt previous bridge models to new structures, led us to choose this software to design all bridges and viaducts,” said Revoltós.

Using Bentley’s application, they performed coordinated multidiscipline modeling and analysis that enabled the geometry adjustments that would ensure design compatibility between the structures.

Working in an open digital environment allowed the geotechnical and bridge design and construction teams to share information and determine the optimal bored pile diameters for the main bridge and viaducts. They also ensured that the structural solutions could withstand the seismic conditions and extreme winds.

SENER also used OpenBridge to conduct detailed structural checks to ensure that each structural element was correctly developed and verified. Meanwhile, automating post-processes allowed the team to completely control the design schedule and to adjust resources and tasks as necessary. The software’s versatility, interoperability and intelligent modeling and analysis facilitated a fast-track design process and model-based construction workflows to address the complex construction sequence and constrained project schedule.

Implementing collaborative digital modeling and analysis processes using OpenBridge streamlined workflows, enabling SENER to timely develop the models and meet the project schedule. OpenBridge’s flexibility to update models simplified the geometry adjustments required for design compatibility. This capability reduced coordination time between design teams and allowed them to achieve high-quality digital designs.

Based on the detailed calculations, the design teams reduced the dimensions of the foundations and minimised the impact on the coral seabed. Having highly accurate models in an open digital platform facilitated collaboration with the construction team, optimising time on site.

Furthermore, Bentley’s application automated post-processes, allowing SENER to generate calculation reports flexibly and efficiently, saving additional time and costs by almost 30%, explained Revoltós. Working in Bentley’s connected digital environment also improved review and approval efficiencies, accelerating approvals of different parts of the project, enabling construction to begin in the shortest possible time.

The intermediate control steps enabled by the software, together with the quality control sheets, made internal verification efficient and traceable. “The use of OpenBridge, in conjunction with internal quality control processes, minimised potential errors in the final product,” said Revoltós.

Bentley Systems is an American software development company that manufactures, licenses, sells and supports computer software and services for the design, construction and operation of infrastructure.

Material was supplied by Amy Heffner, director of product marketing at Bentley Systems. 

For more information on companies in this article

Related Content

  • Presidio Parkway: the Golden Gate Bridge’s new southern approach road
    May 29, 2013
    Work on the Presidio Parkway, a new breathtaking and eco-friendly southern approach road to San Francisco’s Golden Gate Bridge, has entered its crucial second and final phase. As Guy Woodford reports, the vital US$1 billion project has overcome legal as well as environmental challenges to stay on course for its expected 2016 completion Just after 9pm on Friday April 27, 2012 a large public crowd looked on excitedly as a fleet of more than 40 R&L Brosamer and Ferma Corporation deployed hydraulic demolition h
  • Act FAST when it comes to bridge maintenance, argues Cliff Weston
    February 27, 2017
    Deck waterproofing remains critical to a bridge’s structural integrity for its design life, explains Cliff Weston, director of Stirling Lloyd To properly maintain deck waterproofing there must be a willingness to look at solutions based on whole-life costing rather than just short-term initial costs. There are lessons to be learned from examples of prematurely failed infrastructure due to a focus on initial short-term costs.
  • Major advances are being seen in aggregate production technologies
    June 28, 2013
    Recent exhibitions have been launch venues for key developments in aggregate production technologies - Mike Woof reports Efficient production of aggregates is crucial for maintaining cost-effectiveness and also lowering material costs. With contractors owning many of their own quarry operations, these firms understand the benefits of reducing materials costs for their road construction projects. Major developments in the equipment for crushing, screening and washing aggregates are now coming to market and e
  • VDMA is ensuring machine communications
    July 30, 2025
    The VDMA is ensuring integrated machine communications.