Skip to main content

All change – the evolution of data

Embracing change; handling data as an evolutionary process, Mike Woof writes. Bentley Systems believes that it is on the cusp of a revolutionary step in computing that will boost the working efficiency of companies right across industry. Bhupinder Singh, chief products officer at Bentley Systems explained that its key advance will allow firms to utilise what they already have, but more efficiently. He said, “Companies are effectively analysing just 1% of their data. The rest is ‘dark data’ that is stored
January 24, 2018 Read time: 4 mins
Bentley’s new Azure package is one of a range of new developments from the firm
Embracing change; handling data as an evolutionary process, Mike Woof writes


4019 Bentley Systems believes that it is on the cusp of a revolutionary step in computing that will boost the working efficiency of companies right across industry. Bhupinder Singh, chief products officer at Bentley Systems explained that its key advance will allow firms to utilise what they already have, but more efficiently. He said, “Companies are effectively analysing just 1% of their data. The rest is ‘dark data’ that is stored but not used.”

However, the new iModel 2.0 cloud platform and its first new service, iModelHub, now being introduced by Bentley could deliver a quantum leap. This offers users of the ProjectWise design integration services package the option to speed up the process of going digital.

The existing ProjectWise Design Integration service from Bentley Systems has proven highly successful. This package manages file-based workflows for project delivery and is able to cope with the often disconnected nature of infrastructure project work packaging and collaboration. By adding the new iModelHub package Bentley is benefiting from its partnership with Microsoft for the Azure cloud services system. The firm claims that this can deliver a connected project that synchronises project changes, and automatically updates a composite project iModel. The system is said to allow for comprehensive and continuous design reviews, highlighting progress and risks in digital workflows.

The iModelHub package tracks project changes on a timeline, and notifies project participants, based on their ProjectWise workflow configuration, about the availability of relevant changes. Users can choose to synchronise from particular timeline milestones, allowing them to understand the impact of ongoing changes.

Keith Bentley, chief technology officer at Bentley Systems provided some context to this launch. He said that in the early 1980s as a student he listened to a presentation on the coming importance of personal computers by one Bill Gates, which influenced him strongly and led to the founding of Bentley Systems. “It was a once in a lifetime experience,” he said, adding that this latest advance will be just as significant. “Not everyone is lucky enough to have two once in a lifetime experiences,” he joked.

Bentley said that the firm has made major progress and explained, “Back in 2009 we introduced iModels.” This delivered a step change and he continued, “It began to be used outside of design.”

Bentley explained that the original iModel 1.0 was basically a container for information. It could be used to store images, 2D and 3D files and a range of other information. However he explained that the iModel 2.0 is also a relational database and said that is advance is about ‘embracing change’.

“Most people think of the cloud as a large supercomputer with almost infinite power.”

Although iModels are now widely used in industry, Bentley said that the way these are utilised leave much to be desired, “The problem is their data is stored by a programmer who has only one intention.”

He continued, “We can’t leave data in this tangled mess. We need to be able to use it. Change is not an inconvenient truth we can ignore.”

The iModelHub offers an efficient solution and he said, “We need a place to store this change. It is not there to store iModels, it is there to store change.”

Rather than containing files in the conventional sense, the iModelHub is the repository of change. Bentley said, “If iModelHub stores the change, where is the master copy? My master copy is the timeline. We have to embrace change. Let’s visualise that change and show what’s different.”

To provide the full range of analytics across multiple projects, and for connected assets, iModel agents can be programmed for each subject. Users can be notified of project-level changes by iModelHub and the system filters updates, providing accessibility of infrastructure engineering model data for compliance and safety. Capacity is less of an issue and he said, “Another important place where iModels are going to be stored is in the cloud.”

The technology is still in development but Bentley said, “We are working on going live with its iModelBridges solution at the beginning of next year.”

He added, “I think it’s the most exciting thing we have ever done.”

Related Content

  • Heijmans’ bright yellow Dynapacs get the green light at Schiphol
    August 5, 2016
    A damp and foggy morning at Amsterdam’s Schiphol Airport in the Netherlands. Some of the five runways are in normal use, but one of them shows a different kind of activity. At a slow but steady pace, a small army of bright yellow machines is repaving the surface. The project is being carried out by Heijmans, one of the largest road-building contractors in the Netherlands.
  • Wacker’s strong financial performance in 2017 showed growth
    March 23, 2018
    “Over the coming years, we want to rank among the top three providers of core products based on market share in the industry. We also aim to grow faster than the market. In the past year, we have proven that this is possible,” said Lehner. Within the framework of the “Strategy 2022” roadmap, the Group has set itself the goal of significantly exceeding the €2 billion revenue mark in the medium term and achieving an EBIT margin of over 11%. It aims to gradually reduce net working capital to below 30% of
  • Airport expansion for the Maldives assisted by Trimble
    September 6, 2019
    An airport redevelopment and expansion project in the Maldives has been assisted by the use of technology from Trimble. In 2016 the Chinese firm Beijing Urban Construction Group (BUCG) was awarded the contract for the expansion of the Ibrahim Nasir International Airport on Hulhule island in the Maldives, which is part of the Indian Ocean island group. The massive US$440 million expansion and land reclamation work is intended to boost capacity at the Maldives Airport. BUCG has utilised Trimble field solu