Skip to main content

12D for Christchurch

Australia's increasingly popular 12D Model software package for road design, terrain modelling, surveying and drainage has been selected as the main design and survey tool for the coordinated earthquake rebuild of Christchurch in New Zealand The 12D Model software will be the common platform for a group of consultants and contractors making up the recently formed SCIRT, standing for "Stronger Christchurch Infrastructure Rebuild Team". They will use it for survey, repair and rebuild of both the road netwo
June 12, 2012 Read time: 4 mins
Driving along roads in Christchurch calls for vigilance and care

Australia's increasingly popular 12D Model software package for road design, terrain modelling, surveying and drainage has been selected as the main design and survey tool for the coordinated earthquake rebuild of Christchurch in New Zealand

The 12D Model software will be the common platform for a group of consultants and contractors making up the recently formed SCIRT, standing for "Stronger Christchurch Infrastructure Rebuild Team". They will use it for survey, repair and rebuild of both the road network in the city and much of the drainage and water pipe network, which is most coincident with the roads.

The rebuild effort is likely to take at least five years and cost around NZ$2 billion said team member Adam Churchill, an engineer with the New Zealand consultant 2671 Beca. He has been appointed software system manager to oversee the coordination of software for the group which includes four major construction firms and four consultants as well as local and regional government. They are responsible for all horizontal linear infrastructure he said: roads, drainage and the reticulated water network.

The group comprises Christchurch City Council, Canterbury Earthquake Recovery Authority (CERA), the 1009 New Zealand Transport Agency, with contractors City Care, 2679 Downer, 2675 Fletcher Construction, 6191 Fulton Hogan, and MacDow New Zealand and consultants GHD, URS, 1524 Sinclair Knight Merz, Beca Opus and Eliot Sinclair.

Together they are working on an alliance basis, a form of strong teamwork operation that has been developing in Australia and New Zealand for the last decade and a half.

The work is extensive. The 6.3 magnitude event in February last year was overshadowed by the giant earthquake and tsunami disaster in  Japan shortly afterwards, but despite its lesser absolute magnitude was a significant disaster. Not only was it one of the largest in the last century for this young country, taking a toll of 185 fatalities, and causing massive damage across the city, but it has been followed by two more in June and December last year of around magnitude six.

Damage was particularly bad in the central area of the city, New Zealand's third biggest, where soft ground suffered major liquefaction effects.

"We do not have major highways here" Churchill tells 3260 World Highways "but the entire road network has been damaged with buckling and fissuring on most of the roads. Liquefaction caused "floating" of many manholes which now protrude up to 100mm from the surface."

He says driving home in the evening across the "munted" roads is a significant exercise in vigilance and avoidance. "Munted" is a local word for damaged.

The thousands of manholes and the local network in a city area at least 15km across have to be surveyed and then repairs be designed and carried out. Over 200km of roads and 80km of pipes are to be examined as well as bridges, retaining walls and culverts.

For doing this work, and for building up a 3D model of both design and "as built" data for the client at the end, 12D was assessed as the most suitable tools says Churchill. Its antipodean origin is an obvious advantage for support but he said its various modules for survey work, road design and for drainage network design all made it a useful tool.

It allows visualisation to be created quickly and for the drainage to be seen beneath the roads. "It also has the capacity to allow attributes  or metadata to be added to nodes, lines and points," he said, "which is very useful for tracking the particular input authors, tagging dates and changes, and for filtering the design in various ways when extracting information."

He said the assignment of attributes will also help the client bodies build a large GIS-based database model of the work as it proceeds. "We are waiting for Version 10 which has web map functionality that will help further with this." 

For more information on companies in this article

Related Content

  • Golden route to success
    July 20, 2012
    Built in 1937 and still the ninth longest suspension bridge in the world, the Golden Gate Bridge across San Francisco Bay remains in fine shape despite its age - Andrew Bardin Williams writes The Golden Gate Bridge turned 75 years old on May 27 and continues to play a key role in the transportation, engineering, construction and ITS communities. The structure has played an important historical role, an engineering success that boosted the economy of the region. And it also led the way as the first major pub
  • Golden opportunities in the MINT - Mexico, Indonesia, Nigeria, Turkey
    May 21, 2015
    Mexico, Indonesia, Nigeria, Turkey – Global Report offers up some food for thought about where smart money might be headed within the next several years – David Arminas writes China’s rate of growth may be slowing down, but other South East Asian companies are being quick to offer alternate investment opportunities, notably Indonesia. Nigeria, too, has had issues with security of investment. But there are signs that the government may be getting serious at last about tightening up rules and regulation
  • Building Egypt's world class Desert Highway
    May 3, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong