Skip to main content

12D for Christchurch

Australia's increasingly popular 12D Model software package for road design, terrain modelling, surveying and drainage has been selected as the main design and survey tool for the coordinated earthquake rebuild of Christchurch in New Zealand The 12D Model software will be the common platform for a group of consultants and contractors making up the recently formed SCIRT, standing for "Stronger Christchurch Infrastructure Rebuild Team". They will use it for survey, repair and rebuild of both the road netwo
June 12, 2012 Read time: 4 mins
Driving along roads in Christchurch calls for vigilance and care

Australia's increasingly popular 12D Model software package for road design, terrain modelling, surveying and drainage has been selected as the main design and survey tool for the coordinated earthquake rebuild of Christchurch in New Zealand

The 12D Model software will be the common platform for a group of consultants and contractors making up the recently formed SCIRT, standing for "Stronger Christchurch Infrastructure Rebuild Team". They will use it for survey, repair and rebuild of both the road network in the city and much of the drainage and water pipe network, which is most coincident with the roads.

The rebuild effort is likely to take at least five years and cost around NZ$2 billion said team member Adam Churchill, an engineer with the New Zealand consultant 2671 Beca. He has been appointed software system manager to oversee the coordination of software for the group which includes four major construction firms and four consultants as well as local and regional government. They are responsible for all horizontal linear infrastructure he said: roads, drainage and the reticulated water network.

The group comprises Christchurch City Council, Canterbury Earthquake Recovery Authority (CERA), the 1009 New Zealand Transport Agency, with contractors City Care, 2679 Downer, 2675 Fletcher Construction, 6191 Fulton Hogan, and MacDow New Zealand and consultants GHD, URS, 1524 Sinclair Knight Merz, Beca Opus and Eliot Sinclair.

Together they are working on an alliance basis, a form of strong teamwork operation that has been developing in Australia and New Zealand for the last decade and a half.

The work is extensive. The 6.3 magnitude event in February last year was overshadowed by the giant earthquake and tsunami disaster in  Japan shortly afterwards, but despite its lesser absolute magnitude was a significant disaster. Not only was it one of the largest in the last century for this young country, taking a toll of 185 fatalities, and causing massive damage across the city, but it has been followed by two more in June and December last year of around magnitude six.

Damage was particularly bad in the central area of the city, New Zealand's third biggest, where soft ground suffered major liquefaction effects.

"We do not have major highways here" Churchill tells 3260 World Highways "but the entire road network has been damaged with buckling and fissuring on most of the roads. Liquefaction caused "floating" of many manholes which now protrude up to 100mm from the surface."

He says driving home in the evening across the "munted" roads is a significant exercise in vigilance and avoidance. "Munted" is a local word for damaged.

The thousands of manholes and the local network in a city area at least 15km across have to be surveyed and then repairs be designed and carried out. Over 200km of roads and 80km of pipes are to be examined as well as bridges, retaining walls and culverts.

For doing this work, and for building up a 3D model of both design and "as built" data for the client at the end, 12D was assessed as the most suitable tools says Churchill. Its antipodean origin is an obvious advantage for support but he said its various modules for survey work, road design and for drainage network design all made it a useful tool.

It allows visualisation to be created quickly and for the drainage to be seen beneath the roads. "It also has the capacity to allow attributes  or metadata to be added to nodes, lines and points," he said, "which is very useful for tracking the particular input authors, tagging dates and changes, and for filtering the design in various ways when extracting information."

He said the assignment of attributes will also help the client bodies build a large GIS-based database model of the work as it proceeds. "We are waiting for Version 10 which has web map functionality that will help further with this." 

For more information on companies in this article

Related Content

  • PPRS Nice 2018: maintenance moves mountains
    June 22, 2018
    Strategic maintenance was a major theme at the second Pavement Preservation and Recycling Summit in Nice, France. The world is changing, mobility is changing and so roads must change and adapt for the future.” With this brief statement, Jacques Tavernier opened the second PPRS Summit. “At the same time there is a growing awareness of poor or non-existent maintenance for highways. The question for this conference is how to adapt road maintenance in the face of this challenge,” said Tavernier, in his role as
  • Pilosio Building Peace Awards event attracts high profile speakers
    November 10, 2015
    Actress Sharon Stone challenged guests at the fifth annual awards in Milan to “build me a school”; they accepted. World Highways was there. What does it take to galvanise people into action to help people in need, especially refugees during a time of conflict – as in Syria now? For some it has been the recent media stories – and distressing images – of the child Aylan Kurdi, a three-year old Syrian refugee whose lifeless body lay face down on a beach in Turkey.
  • Funding road research in Kenya as infrastructure development grows
    August 14, 2017
    The demand for road construction material research and testing services in Kenya is expected to soar. The East African country is going through a construction boom, despite policy and financial challenges facing public institutions overseeing the research and testing operations in the transport industry. “Kenya is going through a construction boom and so is the demand for construction material testing services,” said Juma Ali Madzitsa, Geotechnical Lab Supervisor at SGS Kenya, a subsidiary of Swiss based in
  • Herrenknecht’s Alice heads back underground at Waterview
    December 19, 2014
    Alice, one of world's largest tunnel boring machines, has started its second tunnel drive for the Waterview Connection project in Auckland, New Zealand. The 90m-long, 3100tonne tunnel borer completed the first twin tunnel, at 2.4km, in September after 11 months of digging, as World Highways reported at the time. The machine has a boring diameter of 14.46m and its cutting wheel is driven by 24 electric motors with a total output of 8,400kW.