Skip to main content

Work to start on triple-deck roundabout in North Tyneside, UK

June 30, 2016
Construction of a major triple-deck roundabout in North Tyneside, England starts in August.

The roundabout is part of an upgrade to the A19/A1058 Coast Road junction that includes lowering the A19 beneath the existing A1058 Coast Road and roundabout.

The €90 million scheme is on the main route to and from the Tyne Tunnel and will mean that people travelling along the A19 will no longer have to queue at the roundabout to go continue their journey straight ahead. Instead, drivers will use a new section of road which will run under the junction.

The 11km Tyne Tunnel consists of two two-lane toll tunnels under the River Tyne near Newcastle upon Tyne in North East England. One was completed in 1967 and the other in 2011. They connect the town of Jarrow on the south bank of the river with North Shields and Howdon on the northern shore.

The original tunnel was one of three forming the original Tyne Tunnel Project; the others are the pedestrian and cyclist tunnels opened in 1951.

The improvements are part of the UK government’s five-year €18 billion roads investment programme.

Commuters recently used the Tyne Tunnel for free while work continued to repair a sinkhole on the A1, according to local media reports.

Related Content

  • Highways England awards €2.1 billion of upgrades for UK motorways
    August 7, 2015
    Highways England has today appointed six joint-venture companies to design and build 10 “smart motorways” as part of a €2.1 billion investment. Construction contractors appointed are the Balfour Beatty and VINCI joint venture, a Costain and Galliford Try joint venture, as well as a Carillion and Kier joint venture. Designers are a CHM2 and Hyder joint venture, an Amey and Arup joint venture, as well as a Jacobs and Atkins joint venture. The award is the second major procurement to be given under th
  • Challenges of NMT in Nairobi, Dar es Salaam
    September 13, 2016
    Developing safety for non-motorised transport in East Africa - Shem Oirere writes. Despite increasing national budgetary allocations for the road sector in recent years, governments in East Africa have made very low investments in non-motorised transport (NMT). This is despite the fact that both Kenya and Uganda have recently passed a policy on pedestrian and cycling safety. In Kenya, the County government of Nairobi, the country’s capital, has embraced a NMT policy, while in Uganda the government has passe
  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen
  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen