Skip to main content

VÖGELE adapts to changing market

March 11, 2017
Manoeuvring and paving speeds are different in the North American market and VÖGELE’s range reflects this. The company takes global products and adapts them: for example, offering rubber band tracks for higher speeds or larger hoppers for highway work. VÖGELE wants to be the leader in this territory in three years – and believes that with its variety of product options and technology there is no reason why this cannot happen
Exhibitions

Related Content

  • Electric paving becoming a reality
    July 21, 2025
    Electric asphalt paving machines are becoming a reality – Mike Woof writes
  • New wheeled loaders from Case
    February 14, 2012
    CASE CONSTRUCTION Equipment introduces three new F Series wheeled loaders to European customers. The 721F (operating weight 14,929kg), the 821F (17,633kg) and the 921F (19,857kg) are said to offer faster acceleration, reduced cycle times, higher travel speeds and increased productivity, yet boast up to a 10% reduction in fuel consumption. The F Series loaders are powered by Tier 4 interim diesel engines, with improved programmable power modes. An optional five-speed transmission further boosts fuel
  • Ammann CBS 105 Elba mixing plant in the Hauts-de-France region
    July 10, 2018
    A new Ammann CBS 105 Elba concrete mixing plant in the Hauts-de-France region GTP is an independent family company owned and managed by the Pruvo brothers at Cauchy-à-la-Tour near Béthune in the Hauts-de-France region, north-east France. Housed in a former brickworks, the firm specialises in recycling materials with a focus on road residues. With the aim of diversifying its activities, GTP turned its attention to ready-mixed concrete and production of treated gravel for local demand and also to meet its
  • Caterpillar Paving offers a guide to efficient night time paving practices
    October 3, 2014
    Efficient night-time paving operations can reduce construction costs and cut traffic delays - *Todd Mansell writes As roads become more congested, the user cost of daytime lane closures to accommodate road construction and paving has increased dramatically. One solution to lower user costs associated with traffic delays is to carry out more paving at night during off-peak times. However night-time paving brings new challenges to producing quality work in safely.