Skip to main content

VIDEO: US bridge removed with explosive demolition

September 28, 2015
A defunct bridge has been removed in the US State of Louisiana using explosive demolition techniques. The OK Allen Bridge was removed at the weekend, following a planned blast carried out by a demolition specialist. The bridge psanned the Red River for 79 years, providing a connection between Alexandria and Pineville. Traffic was halted on the Curtis-Coleman Bridge, which carries US 71, for safety during the demolition. The steelwork of the old bridge will be removed from the river and sold for scrap, although its concrete piers still have to be demolished. Meanwhile a new structure will be constructed on the site of the old bridge as part of the Curtis-Coleman link.

Related Content

  • Ground control to mining truck offers efficiency gains
    June 19, 2015
    Autonomous and remote control machines are not about to take over the world, but they can provide efficiency gains and savings in some operations – Colin Sowman writes The thought of autonomous machines may conjure up visions of an Orwellian future where society works for the ‘common good’ defined by an all-powerful being and in which people are insignificant in terms of their needs, aspirations and physical wellbeing; of machines that relentlessly carry out their task regardless of anybody or anything that
  • Colombia bridge collapse cause indentified
    May 3, 2018
    The recent collapse of the Chirajara Bridge in Colombia has been attributed to design flaws. The Colombian Government has said that it will not pay for rebuilding the structure. Instead, the Colombian Government expects road company Coviandes and its insurance cover to pay for the rebuilding work. The remains of the collapsed structure have yet to be demolished completely. A number of contractors have expressed an interest in building the new bridge, with the work expected to take around 18-24 months to car
  • Airport runway rebuild at Bologna
    May 15, 2019
    Rebuilding a runway requires special attention to detail to maximise efficiency and safety Airport runways face special challenges with regard to the loads they carry on a daily basis, particularly when aircraft are landing. A modern jet aircraft will typically land at speeds of around 240-260km/h, with a laden 747 weighing as much as 265tonnes at the end of a long flight. The stresses these large aircraft place on runway surfaces are enormous and not just with the massive impact forces exerted during
  • New South Africa bridge project for STRABAG
    September 6, 2017
    Contractor STRABAG is to work on the project to build a new bridge connection in South Africa. This structure is of note as it will be Africa’s highest bridge at 223m high. The 1,132m long bridge will span the Mtentu River in eastern South Africa, close to the town of Flagstaff. The contract has a value of around €106 million and the construction work is expected to take 40 months to complete. STRABAG International is working with the South African contractor AVENG Grinaker-LTA on the project