Skip to main content

VIDEO: UK overnight bridge demolition job

May 16, 2016
A spectacular video shows footage a key bridge demolition job in the UK. The bridge crossing the busy A38 near Plymouth was demolished during a weekend possession on the 14th and 15th of May 2016. The footage has been released by 8100 Highways England and shows the old Merafield Bridge at Plympton being demolished overnight on Saturday 14th May, marking the final stage of a £6.3 million maintenance project on the A38.

A new bridge was built alongside the old structure and was opened two weeks ago. The project was completed as the Government delivers a £15 billion upgrade to motorways and major A-roads.

Approximately 50kgs of explosives were used, contained within 278 drilled locations concentrated around the supporting piers and the abutments at each end. The new concrete bridge is 80m long, 11.3m wide and made of 2,503tonnes of concrete and 401tonnes of steel.

The old bridge had to be removed as it was suffering from alkali silica reaction, commonly known as 'concrete cancer'. In time, the structure would eventually become unsafe, and it needed replacing before that happened.

Parts of the old bridge were not fully broken up in the demolition, so work to break up and remove the bridge continued into the afternoon of Sunday 15th May. Throughout the project, timing of the work has been coordinated to avoid disruption during the South West’s busy holiday season.

The scheme will be fully completed by July. Remaining work will include clearing away the debris from the demolished structure, completing drainage on Merafield Road, finishing works on the new bridge and reinstating the road markings on the A38.

For more information on companies in this article

Related Content

  • Stonehenge Bypass contract awarded to consortium
    October 3, 2022
    The Stonehenge Bypass contract has been awarded to a consortium.
  • Italy’s Morandi Bridge collapses killing at least 35
    August 15, 2018
    Investigators and rescuers in the northern Italian city of Genoa are scouring the wreckage of a cable stayed motorway bridge that collapsed, killing at least 35 people. A tower collapsed and then a 209m section – the longest - plummeted to the river and train tracks below at around 11:30 during heavy rain, media sources said. One truck driver managed to stop only metres from the edge of the missing section of bridge. "It was just after 11:30 when we saw lightning strike the bridge," an eyewitness was quote
  • Giving four hours back to the day… and much more
    October 7, 2019
    A 20km long elevated expressway in Dhaka will be one of Bangladesh’s first Public Private Partnership transport projects – words and pictures by Ruby Kitching, on behalf of Mott MacDonald.
  • Tackling flood damage with geosynthetics
    June 22, 2012
    Ian Fraser, Tensar International’s director of application technology, looks at the latest lessons learned from the flood-hit Workington Bridge project in Cumbria, North West England. Rarely has a disaster like the Cumbrian floods demonstrated with more clarity the benefit of designing working platforms and bridge abutments to tested performance standards, as opposed to slavishly following accepted, but often much less efficient, design norms.