Skip to main content

VIDEO: UK overnight bridge demolition job

May 16, 2016
A spectacular video shows footage a key bridge demolition job in the UK. The bridge crossing the busy A38 near Plymouth was demolished during a weekend possession on the 14th and 15th of May 2016. The footage has been released by 8100 Highways England and shows the old Merafield Bridge at Plympton being demolished overnight on Saturday 14th May, marking the final stage of a £6.3 million maintenance project on the A38.

A new bridge was built alongside the old structure and was opened two weeks ago. The project was completed as the Government delivers a £15 billion upgrade to motorways and major A-roads.

Approximately 50kgs of explosives were used, contained within 278 drilled locations concentrated around the supporting piers and the abutments at each end. The new concrete bridge is 80m long, 11.3m wide and made of 2,503tonnes of concrete and 401tonnes of steel.

The old bridge had to be removed as it was suffering from alkali silica reaction, commonly known as 'concrete cancer'. In time, the structure would eventually become unsafe, and it needed replacing before that happened.

Parts of the old bridge were not fully broken up in the demolition, so work to break up and remove the bridge continued into the afternoon of Sunday 15th May. Throughout the project, timing of the work has been coordinated to avoid disruption during the South West’s busy holiday season.

The scheme will be fully completed by July. Remaining work will include clearing away the debris from the demolished structure, completing drainage on Merafield Road, finishing works on the new bridge and reinstating the road markings on the A38.

For more information on companies in this article

Related Content

  • Doka rises to the challenge on Turkey’s Eyiste Viaduct
    June 4, 2019
    Formwork specialist Doka recently rose to the challenge on Turkey’s Eyiste Viadust, the country’s highest bridge with piers up to 155m tall. The Eyiste Viaduct will be part of a route between Central Anatolia and Turkey’s Mediterranean region, shortening travel time between the cities of Konya and Alanya. Cantilever forming travellers and Doka’s automatic climbing formwork Xclimb 60 were part of the construction solution. The viaduct is nearly 1.4km long and carried by two abutments and eight piers, stret
  • Terex cranes in a tight spot in Michigan
    February 6, 2017
    Terex cranes have been involved in a multiple bridge repair project in the US More than 96,000 vehicles per day travel a stretch of I-96, including its 52-year-old bridges. The Michigan Department of Transportation is in the midst of a two-year US$77 million project to repair bridges and relieve increasing congestion along Interstate 96 at the U.S. Highway 23 interchange in Livingston County. Toebe Construction along with joint venture partner Kamminga & Roodvoets are bringing in a lot of lifting powe
  • Protecting the roadway with guard rails
    November 10, 2015
    Tata Construction Products is a major player in the European road protection market and aims to boost its share of business - Mike Woof writes. Part of the massive Tata Group, Tata Construction Products is a major player in Europe’s business segment for steel guard rails. Rodney Rice, marketing manager, Tata Steel Construction Products, said, “Our market is predominantly Europe.”
  • New UK motorway link under construction
    June 18, 2015
    Construction of a new junction on the M1 near Dunstable in Bedfordshire is starting in the UK. The new junction, junction 11A, is located just to the south of Toddington services and forms part of a new €225 million link road between the A5 and the M1 that will help to unlock growth and reduce congestion in the area. Work on the link road began in March.