Skip to main content

VIDEO: UK overnight bridge demolition job

May 16, 2016
A spectacular video shows footage a key bridge demolition job in the UK. The bridge crossing the busy A38 near Plymouth was demolished during a weekend possession on the 14th and 15th of May 2016. The footage has been released by 8100 Highways England and shows the old Merafield Bridge at Plympton being demolished overnight on Saturday 14th May, marking the final stage of a £6.3 million maintenance project on the A38.

A new bridge was built alongside the old structure and was opened two weeks ago. The project was completed as the Government delivers a £15 billion upgrade to motorways and major A-roads.

Approximately 50kgs of explosives were used, contained within 278 drilled locations concentrated around the supporting piers and the abutments at each end. The new concrete bridge is 80m long, 11.3m wide and made of 2,503tonnes of concrete and 401tonnes of steel.

The old bridge had to be removed as it was suffering from alkali silica reaction, commonly known as 'concrete cancer'. In time, the structure would eventually become unsafe, and it needed replacing before that happened.

Parts of the old bridge were not fully broken up in the demolition, so work to break up and remove the bridge continued into the afternoon of Sunday 15th May. Throughout the project, timing of the work has been coordinated to avoid disruption during the South West’s busy holiday season.

The scheme will be fully completed by July. Remaining work will include clearing away the debris from the demolished structure, completing drainage on Merafield Road, finishing works on the new bridge and reinstating the road markings on the A38.

For more information on companies in this article

Related Content

  • Danube bridge takes shape
    February 10, 2012
    A new bridge over the River Danube between Bulgaria and Romania is expected to benefit to the economies of both nations. Krasimir Krastanov reports
  • Italian viaduct job for Conjet
    July 4, 2012
    The multi-span reinforced concrete viaduct at Torano, about 100km east of the Italian capital Rome, is a major structure on the main E80/A24/A25 Autostrada crossing central Italy. The Viadotto Fiume Salto was opened in the late 1960s, but the use of de-icing salts during winter months has since caused considerable calcium chloride damage to the structure forcing the Italian Highways Authority and the Autostrada di Parchi's owner Toto to carry out extensive repairs. The renovation estimated at around €5 mill
  • Novel concrete paving method used in Germany
    January 25, 2017
    A novel dual-layer concrete paving technique has been used on jobsites in Germany on the country’s high-speed Autobahn network This technique allows the construction of a strong and durable roadway structure able to cope with heavy traffic loads and offer a long working life. In four German states, Wirtgen SP-1500 slipformers have been employed by four different contractors to carry out dual-layer paving. The method allows a noise-reducing, non-skid exposed aggregate surface to be placed over a bottom
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v