Skip to main content

VIDEO of specialist contractor’s successful bridge demolition in Canada

May 12, 2015
Specialist contractor Priestly Demolition recently carried out a successful project in Ontario, Canada. The firm used its specialist skills to remove The Fountain Road Overpass, crossing Highway 401. A fleet of excavators equipped with demolition tools, including breakers and cutting equipment, was brought into to carry out the work using an overnight closure of the highway. Other machines including wheeled loaders and backhoe loaders were used to remove the broken out materials and to carry out other general duties. In all 2,500tonnes of concrete and 10tonnes of steel reinforcing bar was removed from the structure in over 120 truck loads, with all of this material being recycled. Spanning 10 lanes of the highway the concrete overpass was removed during the allotted time period, allowing traffic to begin flowing next morning as planned.

Related Content

  • 48 hours re-opening
    July 6, 2012
    Using demolition tools from Atlas Copco helped to maximise productivity on a highly time-sensitive project in Germany. The A3 autobahn runs from the Dutch/German border through the western part of the Ruhr area, the Cologne area, the Rhine-Main area and Bavaria down to the Austrian border at Stuben. It is one of the most heavily used highways in Germany and because of increasing traffic volumes, widening the road to six lanes has become necessary.
  • Doha’s massive ring road expressway project
    July 10, 2019
    The huge Doha ring road project will help decongest the city and improve transport for Qatar
  • Ageing Liberty Tunnels in US refurbished with hydrodemolition
    May 13, 2015
    Hydrodemolition surface preparation keeps Liberty Tunnel rehabilitation project on schedule in Pittsburgh. The Pennsylvania state Department of Transportation selected hydrodemolition surface preparation for the US$18.8 million rehabilitation of Pittsburgh’s Liberty Tunnels. Time was of the essence to complete the project on deadline without penalties and hydrodemolition was selected as it offered a fast and cost-effective method to prepare the tunnel walls for a new, shotcrete surface. This methods off
  • Developments in asphalt compaction machines
    July 4, 2012
    Mike Woof reviews the latest compaction market developments In the run-up to the upcoming World of Asphalt event in Orlando, Florida in March, the leading compaction equipment firms are rolling out upgraded and improved machines. With market conditions tough worldwide, customers are also likely to be encouraged with competitive deals on purchasing new machines and replacing ageing fleets.