Skip to main content

VIDEO of specialist contractor’s successful bridge demolition in Canada

May 12, 2015
Specialist contractor Priestly Demolition recently carried out a successful project in Ontario, Canada. The firm used its specialist skills to remove The Fountain Road Overpass, crossing Highway 401. A fleet of excavators equipped with demolition tools, including breakers and cutting equipment, was brought into to carry out the work using an overnight closure of the highway. Other machines including wheeled loaders and backhoe loaders were used to remove the broken out materials and to carry out other general duties. In all 2,500tonnes of concrete and 10tonnes of steel reinforcing bar was removed from the structure in over 120 truck loads, with all of this material being recycled. Spanning 10 lanes of the highway the concrete overpass was removed during the allotted time period, allowing traffic to begin flowing next morning as planned.

Related Content

  • Building an airport for St Helena
    August 29, 2013
    The remote South Atlantic island of Saint Helena will shortly benefit from the construction of a new airport as well as access roads and supporting infrastructure. This is the biggest construction project in the history of the island, which lies nearly 2,000km off the coast of Africa. The airport is expected to boost economic development for the island’s 4,000 residents with an estimated 20,000 people a year forecasted to visit this highly remote, 122km2 equatorial volcanic outcrop. At present the islan
  • Canada’s toll Highway 407 extension east of Toronto opens
    June 21, 2016
    A US$780 million eastward extension to Toronto’s major toll highway 407 has opened after four years of construction. Work on 407 East Phase 1 project – which also included construction of the smaller Highway 412 – involved building more than 148 lane-kilometres and 11 interchanges. The 22km road stretches from Brock Road in the town of Pickering to Harmony Road in the city of Oshawa. Highway 412 is a 10km north-south road that connects Highway 407 to Highway 401. Travel on the toll road will be free u
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w
  • Growth in a versatile workforce
    July 19, 2012
    Some of the biggest names in the construction industry have released innovative new utility machines and equipment in the first few months of 2012. Guy Woodford looks at some of the latest models To mark the 25th anniversary of the Bobcat compact excavaor range, the Doosan-owned company recently unveiled a new limited edition version of the Bobcat E16. The special 1.6 tonne model is said by the company to provide an attractive complement to the also new and enhanced versions of both the E16 and 1.4tonne E1