Skip to main content

VIDEO: Saskatoon’s Traffic Bridge demolished to make way for new bridge

January 11, 2016
A 100-year-old Parker truss bridge in western Canada had no official name until its 90th birthday, in 2007. Now, The Traffic Bridge – across the South Saskatchewan River in the city of Saskatoon - is no more, after its demolition earlier this month.

The Traffic Bridge, nearly 6m wide and 290m long and took a year to build, and was Saskatoon’s first bridge across the river when it opened in 1907. The bridge was built by Winnipeg city-based John D. Gunn and Sons.

It was unofficially known by many names but never officially named until it was 90 years old. In 2007 city council officially recognised the bridge as the Traffic Bridge.

In 2010, the two-lane bridge was permanently closed due to severe corrosion, mostly along the bottom chord and bottom chord connections, flooring system and deck, according to the historic bridge. It was then partially demolished before this month’s complete demolition done in two phases.

Rakowski Cartage & Wrecking said that most of the bridge’s structural steel, treated wood and asphalt overlay will be recycled.

A new bridge, similar in design, will be built on the same spot and should be open by 2018.

Related Content

  • Key projects free up Auckland's congested motorway network
    June 14, 2012
    A number of key projects in Auckland, New Zealand will free-up the city’s congested motorway network - Mary Searle reports.Auckland is a sprawling city, home to 1.4 million people, one third of New Zealand’s total population. Until recently, greater Auckland comprised Auckland city, North Shore city over the harbour bridge to the north, Waitakere city to the west and Manukau city to the south. An amalgamation of these various cities’ councils, plus the regional council and three district councils into one,
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Bridge spanning Nepal’s Bagmati River open to traffic
    April 3, 2014
    The bridge linking Old Baneshwor and Sinamangal over the Bagmati River in Nepal’s capital Kathmandu has now been officially opened. This was carried out by the former minister for Physical Planning and Transport although the bridge itself had been open to traffic for five months prior to the inauguration. The old bridge had to be closed after one of the piers subsided in September 2009, a common problem for bridges in Nepal. The Nepalese Government has initiated the new bridge in January 2010. There have be
  • VIDEO: UK overnight bridge demolition job
    May 16, 2016
    A spectacular video shows footage a key bridge demolition job in the UK. The bridge crossing the busy A38 near Plymouth was demolished during a weekend possession on the 14th and 15th of May 2016. The footage has been released by 8100 Highways England and shows the old Merafield Bridge at Plympton being demolished overnight on Saturday 14th May, marking the final stage of a £6.3 million maintenance project on the A38.