Skip to main content

VIDEO: Saskatoon’s Traffic Bridge demolished to make way for new bridge

January 11, 2016
A 100-year-old Parker truss bridge in western Canada had no official name until its 90th birthday, in 2007. Now, The Traffic Bridge – across the South Saskatchewan River in the city of Saskatoon - is no more, after its demolition earlier this month.

The Traffic Bridge, nearly 6m wide and 290m long and took a year to build, and was Saskatoon’s first bridge across the river when it opened in 1907. The bridge was built by Winnipeg city-based John D. Gunn and Sons.

It was unofficially known by many names but never officially named until it was 90 years old. In 2007 city council officially recognised the bridge as the Traffic Bridge.

In 2010, the two-lane bridge was permanently closed due to severe corrosion, mostly along the bottom chord and bottom chord connections, flooring system and deck, according to the historic bridge. It was then partially demolished before this month’s complete demolition done in two phases.

Rakowski Cartage & Wrecking said that most of the bridge’s structural steel, treated wood and asphalt overlay will be recycled.

A new bridge, similar in design, will be built on the same spot and should be open by 2018.

Related Content

  • Peab wins Tullgarn Bridge deal in Uppsala
    January 11, 2022
    The €15.25 million project is part of infrastructure expansion plans for the Swedish city.
  • ARTBA makes awards
    February 29, 2012
    A series of highway and bridge projects across the US have been recognised for their contributions to environmental protection and mitigation.
  • New bridge being planned for German city Bonn
    July 16, 2018
    A new bridge project is being planned for the German city of Bonn. The city has three bridges crossing the Rhein River, the North, South and Kennedy Bridges. The North Bridge is in need of replacement as it is no longer able to meet the city’s traffic needs. The existing structure will be demolished and replaced with a new bridge in a project worth €205 million. Plans should be ready for the new link in 2020, with construction expected to commence in 2028.
  • Road widening means bridge demolition
    February 24, 2012
    Two heavy Atlas Copco hydraulic breakers have been used to demolish a bridge on the A40 autobahn at Junction 28 in Gelsenkirchen-Süd, Germany. The bridge was used to carry the four lanes of the A40 over the B277 main road. As the key route in the Ruhr district, the A40 is being widened to incorporate six lanes, so the old bridge needed to be demolished.