Skip to main content

VIDEO: Saskatoon’s Traffic Bridge demolished to make way for new bridge

January 11, 2016
A 100-year-old Parker truss bridge in western Canada had no official name until its 90th birthday, in 2007. Now, The Traffic Bridge – across the South Saskatchewan River in the city of Saskatoon - is no more, after its demolition earlier this month.

The Traffic Bridge, nearly 6m wide and 290m long and took a year to build, and was Saskatoon’s first bridge across the river when it opened in 1907. The bridge was built by Winnipeg city-based John D. Gunn and Sons.

It was unofficially known by many names but never officially named until it was 90 years old. In 2007 city council officially recognised the bridge as the Traffic Bridge.

In 2010, the two-lane bridge was permanently closed due to severe corrosion, mostly along the bottom chord and bottom chord connections, flooring system and deck, according to the historic bridge. It was then partially demolished before this month’s complete demolition done in two phases.

Rakowski Cartage & Wrecking said that most of the bridge’s structural steel, treated wood and asphalt overlay will be recycled.

A new bridge, similar in design, will be built on the same spot and should be open by 2018.

Related Content

  • First bridge deck section joined on UK’s Mersey Gateway project
    June 30, 2017
    The Mersey Gateway bridge project near Liverpool in England passed a milestone recently with the first joining of two of the deck sections.
  • Rader Hochbrücke construction set for summer
    April 7, 2025
    Work on the Rader Hochbrücke (bridge) near Rendsburg, Germany, will start this summer and take five years, according to DEGES.
  • Underground routes for highways
    July 20, 2012
    Increasingly, and where possible, roads are being built in tunnels often for environmental reasons, writes Patrick Smith As part of the new M7 motorway development in the southwest of Ireland, the four-lane route crosses the River Shannon near Limerick, before it flows into the Atlantic. Centrepiece of the 10km long Limerick Southern Ring Road is the required tunnelling (675m long), which including the north and south entrance and exit ramps, means it will be 915m long. Completion of the work is planned for
  • VIDEO: Sarens raises the pylon for New Wear Crossing in Sunderland
    February 13, 2017
    It was as weekend working in Sunderland city, northeast England, for global lifting specialist 8569 Sarens.

    Over the two days, the Belgian company gently raised a 1,550tonne steel pylon that will form the backbone of the New Wear Crossing – no official name yet – across the River Wear.

    General work on the two-span cable-stay bridge started on the bridge in May 2015. The structure will be supported by the single double pylon and will have four vehicle lanes, as well as dedicated cycle and pedestrian routes.