Skip to main content

VIDEO: Saskatoon’s Traffic Bridge demolished to make way for new bridge

January 11, 2016
A 100-year-old Parker truss bridge in western Canada had no official name until its 90th birthday, in 2007. Now, The Traffic Bridge – across the South Saskatchewan River in the city of Saskatoon - is no more, after its demolition earlier this month.

The Traffic Bridge, nearly 6m wide and 290m long and took a year to build, and was Saskatoon’s first bridge across the river when it opened in 1907. The bridge was built by Winnipeg city-based John D. Gunn and Sons.

It was unofficially known by many names but never officially named until it was 90 years old. In 2007 city council officially recognised the bridge as the Traffic Bridge.

In 2010, the two-lane bridge was permanently closed due to severe corrosion, mostly along the bottom chord and bottom chord connections, flooring system and deck, according to the historic bridge. It was then partially demolished before this month’s complete demolition done in two phases.

Rakowski Cartage & Wrecking said that most of the bridge’s structural steel, treated wood and asphalt overlay will be recycled.

A new bridge, similar in design, will be built on the same spot and should be open by 2018.

Related Content

  • High speed bridge demolition minimises disruption
    April 13, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.
  • Italy's new southern highway route
    May 13, 2021
    An important new highway route is currently under construction in South Italy
  • New German autobahn bridge under constriuction
    May 1, 2015
    Crane manufacturer Manitowoc has supplied six Potain cranes to German contractor Max Bögl. These machines are being used for constructing a new bridge carrying the A3 autobahn, close to Limburg. Working at over 70m high, the cranes tower over the Lahn Valley. The cranes for this project were supplied by Max Bögl’s subsidiary, Max Bögl Transport & Geräte. The three topless Potain MDT 222 cranes were selected for the work as they feature tip heights of up to 76.2m and can operate with a working radius of
  • New Angolan bridge offers improved connectivity
    September 30, 2013
    Drivers in Angola are benefiting from a bridge that spans the Catumbela River, taking the place of an old structure that had proven not fit for purpose. The US$35 million cable stayed bridge is located in the highway between Benguela and Lobito, around 7km from Angola’s Atlantic coast and is one of a series of new infrastructure developments in the country. Angola suffered a long period of war that impacted on its people and infrastructure. The war resulted in severe damage to the country’s road system alon