Skip to main content

VIDEO: Saskatoon bridge demolition removes final span

November 18, 2016
The final section of a defunct bridge in Saskatoon has now been removed by demolition contractor Rakowski Cartage & Wrecking. Excavators fitted with hydraulic breakers were employed by the firm to break up the final span, which collapsed into the river as planned. Demolition work to remove the defunct structure commenced in 2012. Other sections of the bridge were removed using explosive demolition earlier this year.

Work to construct the Saskatoon Traffic Bridge, also known as the Victoria Bridge, commenced in 1906 and the link opened to traffic in 1907. The construction of the 290m long truss-type bridge was instrumental in the development of modern day Saskatoon as the link connected Nutan on the east bank of the South Saskatchewan River, with Saskatoon and Riversdale on the west bank. When the bridge was constructed it cost $106,000, however it closed to traffic in 2010 as it was no longer considered structurally sound. The old structure joined Victoria Avenue to 3rd Avenue South and Spadina Crescent and the new bridge taking its place will be complete in 2018.

Related Content

  • A new bridge now crosses a motorway in the UK
    November 5, 2012
    A new 240tonne bridge has now been installed over the M54 as part of a major overnight engineering operation. The single-span bridge, which stretches 45m over the motorway, is part of wider plans to develop a site in South Staffordshire. To allow engineers to winch the giant structure in safely, both carriageways between junctions 2 and 3 were closed on Saturday, November 3rd. Bridge sections were delivered to a near compound early in the summer where it was pieced together. Just after 11.30pm on Saturday,
  • Realising a dream
    February 20, 2012
    Shem Oirere reports on how major highway projects in eastern African will improve links and the economies of a number of countries in the region
  • Cleveland Bridge: monuments of culture, bridges that define
    July 2, 2021
    Bridges – many designed and renovated by Cleveland Bridge – are part of a city’s architectural landscape. They help define an urban area’s identity, as Carlos Arias*, the company’s international manager, explains in this special feature.
  • Peru’s Matarani – Punta de Bonbon Highway
    January 5, 2016
    A major new highway project in Peru will improve connectivity for the Arequipa region - Mauro Nogarin writes Peru’s Matarani-Bonbon road project is an important route and forms part of the Camana - Dv Quilca - Ilo - Tacna highway project. The road stretches through several provinces in the Arequipa region. The deadline for completing the work is 720 days after January 2015, and it is scheduled to be completed by December 2016. Progress has been good and as of July 2015, it was 80% completed. The main