Skip to main content

VIDEO: Saskatoon bridge demolition removes final span

November 18, 2016
The final section of a defunct bridge in Saskatoon has now been removed by demolition contractor Rakowski Cartage & Wrecking. Excavators fitted with hydraulic breakers were employed by the firm to break up the final span, which collapsed into the river as planned. Demolition work to remove the defunct structure commenced in 2012. Other sections of the bridge were removed using explosive demolition earlier this year.

Work to construct the Saskatoon Traffic Bridge, also known as the Victoria Bridge, commenced in 1906 and the link opened to traffic in 1907. The construction of the 290m long truss-type bridge was instrumental in the development of modern day Saskatoon as the link connected Nutan on the east bank of the South Saskatchewan River, with Saskatoon and Riversdale on the west bank. When the bridge was constructed it cost $106,000, however it closed to traffic in 2010 as it was no longer considered structurally sound. The old structure joined Victoria Avenue to 3rd Avenue South and Spadina Crescent and the new bridge taking its place will be complete in 2018.

Related Content

  • Major Necaxa-Tihuatlan Highway project for Mexico
    October 1, 2014
    A new highway in Mexico is connecting Necaxa with Tihuatlan and the project features challenging terrain - Mauro Nogarin reports In Mexico a landmark highway project is now close to completion, having set a number of records for Latin America.
  • Kuwait’s Sheikh Jaber al-Ahmad Al-Sabah Causeway opens
    August 27, 2019
    World Highways revisits the world’s fourth longest sea bridge - four years to construct and which has slashed travel time between Kuwait’s largest island and the capital city
  • Improving tunneling method selection
    December 11, 2015
    The tunnelling sector remains one of the most active segments of the construction industry worldwide, fuelling demand for equipment However, there have been issues with the efficiency of the selection process for the most suitable tunnelling method for a project in the past. With this in mind, the Italian hydraulic breaker manufacturer Indeco has been working on a new algorithm that allows a contractor to optimise the tunnelling method selection. The firm said that this system has been developed becau
  • Taking the coast road on Reunion Island
    April 4, 2017
    An ambitious project on Reunion Island will improve transport