Skip to main content

VIDEO: Saskatoon bridge demolition removes final span

November 18, 2016
The final section of a defunct bridge in Saskatoon has now been removed by demolition contractor Rakowski Cartage & Wrecking. Excavators fitted with hydraulic breakers were employed by the firm to break up the final span, which collapsed into the river as planned. Demolition work to remove the defunct structure commenced in 2012. Other sections of the bridge were removed using explosive demolition earlier this year.

Work to construct the Saskatoon Traffic Bridge, also known as the Victoria Bridge, commenced in 1906 and the link opened to traffic in 1907. The construction of the 290m long truss-type bridge was instrumental in the development of modern day Saskatoon as the link connected Nutan on the east bank of the South Saskatchewan River, with Saskatoon and Riversdale on the west bank. When the bridge was constructed it cost $106,000, however it closed to traffic in 2010 as it was no longer considered structurally sound. The old structure joined Victoria Avenue to 3rd Avenue South and Spadina Crescent and the new bridge taking its place will be complete in 2018.

Related Content

  • Massive German road investment required
    March 5, 2025
    German is requiring a massive investment in road development.
  • Turkey’s Bosporus bridge opening
    August 25, 2016
    Turkey’s Yavuz Sultan Selim Bridge over the Bosporus is having its official opening, which is being carried out by senior members of the country’s government including president Recep Erdoğan. The final sections of the deck structure were put into place in March 2016 and the project, which commenced in 2013, has been completed in record time. This is the third bridge to span the Bosporus at Turkey’s commercial centre, Istanbul and the new crossing will form part of the country’s North Marmara Highway pro
  • Statens vegvesen reviews bridge management
    August 25, 2023
    Norwegian Public Roads Administration director Ingrid Dahl Hovland wants to ensure that lessons learned regarding wooden bridge failures are integrated into maintenance strategies.
  • New Angolan bridge offers improved connectivity
    September 30, 2013
    Drivers in Angola are benefiting from a bridge that spans the Catumbela River, taking the place of an old structure that had proven not fit for purpose. The US$35 million cable stayed bridge is located in the highway between Benguela and Lobito, around 7km from Angola’s Atlantic coast and is one of a series of new infrastructure developments in the country. Angola suffered a long period of war that impacted on its people and infrastructure. The war resulted in severe damage to the country’s road system alon