Skip to main content

VIDEO: Saskatoon bridge demolition removes final span

November 18, 2016
The final section of a defunct bridge in Saskatoon has now been removed by demolition contractor Rakowski Cartage & Wrecking. Excavators fitted with hydraulic breakers were employed by the firm to break up the final span, which collapsed into the river as planned. Demolition work to remove the defunct structure commenced in 2012. Other sections of the bridge were removed using explosive demolition earlier this year.

Work to construct the Saskatoon Traffic Bridge, also known as the Victoria Bridge, commenced in 1906 and the link opened to traffic in 1907. The construction of the 290m long truss-type bridge was instrumental in the development of modern day Saskatoon as the link connected Nutan on the east bank of the South Saskatchewan River, with Saskatoon and Riversdale on the west bank. When the bridge was constructed it cost $106,000, however it closed to traffic in 2010 as it was no longer considered structurally sound. The old structure joined Victoria Avenue to 3rd Avenue South and Spadina Crescent and the new bridge taking its place will be complete in 2018.

Related Content

  • Long reach equipment simplifies demolition
    April 13, 2012
    Demolition is a highly specialised business, as the machinery required to carry out the work on high-rise demolition contracts can be very site specific. Today's high reach demolition rig is no longer simply a tracked excavator with a long boom, indeed some machines cannot be used as excavators at all. Likewise a machine that is dedicated to carrying a 2.5 or 3tonne shear or hammer will need to be built to take the stresses and strains of demolition life. Many of the ultra long boom machines are designed
  • Key expressway route through Hunter Valley
    November 11, 2013
    Australia’s Hunter Valley will benefit from a new high speed expressway, which is currently under construction - Simon Gould reports Located two hours north of Sydney, the Hunter Valley region in New South Wales is one of Australia’s largest producers of coal and wine. With international demand, particularly from Asia, for both continuing to increase, a significant upgrade of infrastructure was required between the region and the port of Newcastle, the world’s largest coal export port. However the strict en
  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.
  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.