Skip to main content

VIDEO: Saskatoon bridge demolition removes final span

November 18, 2016
The final section of a defunct bridge in Saskatoon has now been removed by demolition contractor Rakowski Cartage & Wrecking. Excavators fitted with hydraulic breakers were employed by the firm to break up the final span, which collapsed into the river as planned. Demolition work to remove the defunct structure commenced in 2012. Other sections of the bridge were removed using explosive demolition earlier this year.

Work to construct the Saskatoon Traffic Bridge, also known as the Victoria Bridge, commenced in 1906 and the link opened to traffic in 1907. The construction of the 290m long truss-type bridge was instrumental in the development of modern day Saskatoon as the link connected Nutan on the east bank of the South Saskatchewan River, with Saskatoon and Riversdale on the west bank. When the bridge was constructed it cost $106,000, however it closed to traffic in 2010 as it was no longer considered structurally sound. The old structure joined Victoria Avenue to 3rd Avenue South and Spadina Crescent and the new bridge taking its place will be complete in 2018.

Related Content

  • Rammer hammer helps break up rock in Malaysia
    January 19, 2016
    A Rammer 5011 rock breaker has been successfully used to break extremely hard granite on a Kuala Lumpur development. The excavation and site preparation for a development project in Taman Connaught, Cheras, in Kaula Lumpur’s south-eastern suburbs was recently undertaken by local civil engineering contractor, Crescendo Infra Sdn Bhd on behalf of a local developer. In order to deal with the extremely hard granite that was found in the locale, it was initially planned to bring in a blasting contractor to help
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi
  • Colombia connectivity to improve with new bridge
    February 2, 2017
    Construction work on Colombia’s landmark Yati-Bodega bridge is already 50% complete. The 2.3km Puente de la Reconciliacion Bridge spans the Magdalena River and when complete, will be the longest in the country. The project is challenging however, due to the river’s flow rate as well as the underlying geology. Once the bridge opens to traffic, it will connect the municipality of Mompox with the rest of Colombia’s Bolivar department. At present Mompox and Magangue are difficult to reach by road due to the lac
  • LagoonHull project put on hold
    February 8, 2023
    The plan by the UK city of Kingston upon Hull is to transform the city centre and river frontage running from the 2.2km-long, single-span suspension Humber Bridge.