Skip to main content

VIDEO: Saskatoon bridge demolition removes final span

November 18, 2016
The final section of a defunct bridge in Saskatoon has now been removed by demolition contractor Rakowski Cartage & Wrecking. Excavators fitted with hydraulic breakers were employed by the firm to break up the final span, which collapsed into the river as planned. Demolition work to remove the defunct structure commenced in 2012. Other sections of the bridge were removed using explosive demolition earlier this year.

Work to construct the Saskatoon Traffic Bridge, also known as the Victoria Bridge, commenced in 1906 and the link opened to traffic in 1907. The construction of the 290m long truss-type bridge was instrumental in the development of modern day Saskatoon as the link connected Nutan on the east bank of the South Saskatchewan River, with Saskatoon and Riversdale on the west bank. When the bridge was constructed it cost $106,000, however it closed to traffic in 2010 as it was no longer considered structurally sound. The old structure joined Victoria Avenue to 3rd Avenue South and Spadina Crescent and the new bridge taking its place will be complete in 2018.

Related Content

  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Successful Nebraska bridge explosive demolition
    February 24, 2014
    The final phase of the Nebraska Bridge demolition has now been carried out successfully. The work went according to plan, despite low temperature conditions and a blizzard on the night before the planned blast. The poor weather did not prevent this last phase of the bridge demolition, located at Rulo in Nebraska. In spite of temperatures well below freezing, the charges placed in the final section of the bridge were detonated and the structure fell into the Missouri River.
  • PERI’s balancing act at the Harpe Bru Bridge in Norway
    May 24, 2016
    Plans for the European Route E6 expansion in Norway include the 320m-long Harpe Bru Bridge over the Gudbrandsdalen Lågen River, at Sør-Fron in Oppland province. For the superstructure, PERI civil engineering technology experts developed a balanced cantilevered solution based on the VARIOKIT Engineering Construction Kit. Statens vegvesen, Norway’s agency for public road building, selected an extradosed cable-stayed bridge design – the first such bridge in Norway. It combines the load-bearing behaviour
  • Brazil’s new road links being planned
    February 2, 2022
    Important new road links are being planned for Brazil.