Skip to main content

VIDEO: Saskatoon bridge demolition removes final span

November 18, 2016
The final section of a defunct bridge in Saskatoon has now been removed by demolition contractor Rakowski Cartage & Wrecking. Excavators fitted with hydraulic breakers were employed by the firm to break up the final span, which collapsed into the river as planned. Demolition work to remove the defunct structure commenced in 2012. Other sections of the bridge were removed using explosive demolition earlier this year.

Work to construct the Saskatoon Traffic Bridge, also known as the Victoria Bridge, commenced in 1906 and the link opened to traffic in 1907. The construction of the 290m long truss-type bridge was instrumental in the development of modern day Saskatoon as the link connected Nutan on the east bank of the South Saskatchewan River, with Saskatoon and Riversdale on the west bank. When the bridge was constructed it cost $106,000, however it closed to traffic in 2010 as it was no longer considered structurally sound. The old structure joined Victoria Avenue to 3rd Avenue South and Spadina Crescent and the new bridge taking its place will be complete in 2018.

Related Content

  • Innovative new drainage solutions will help keep roads free from water
    October 2, 2014
    An array of new technologies will help optimise road drainage and minimise flooding risks - Mike Woof reports In the UK the specialist contractor Lanes Group has carried out extensive inspection work of the drainage systems for the M6 toll route around the city of Birmingham. A powerful zoom camera has been used to carry out the inspection work for Midland Expressway, which operates and maintains the 43km-long motorway, running from Coleshill to Cannock.
  • Russia's key highway development project
    February 8, 2012
    One of the largest construction programmes in Europe is being carried out to get a Russian resort ready for the Winter Olympics. Patrick Smith reports
  • Russia's key highway development project
    May 28, 2012
    One of the largest construction programmes in Europe is being carried out to get a Russian resort ready for the Winter Olympics. Patrick Smith reports. Daytime temperatures top 30°C in September, and with hundreds of shops and hotels, it is not difficult to see why Sochi has become Russia's premier holiday playground. The city, on the east coast of the Black Sea, near the border with Georgia, bustles with tourists, and this is boosted with delegates at the 9th International Investment Forum Sochi 2010.
  • First bridge deck section joined on UK’s Mersey Gateway project
    June 30, 2017
    The Mersey Gateway bridge project near Liverpool in England passed a milestone recently with the first joining of two of the deck sections.