Skip to main content

Video: Romanian cycle paths up in the air

October 10, 2016
Either cycle paths in the southern Romanian city of Targu Jiu are too crowded or this unicyclist needed an adrenalin rush.

Likely the latter, and daredevil Flaviu Cernescu, 33, got his fill as he pedalled around the 1m-wide crumbling rim of a disused industrial brick chimney stack. He is more than 250m up and manages to hop his unicycle over objects before deciding to hang by one hand into the black abyss of the chimney.

Tiring of his unicycle, Cernescu decided to walk and juggle his way around the rim.

He is apparently blessed with a superior sense of balance. A couple years ago he took his unicycle out for a spin %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal around the rim Visit www.telegraph.co.uk News Page false http://www.telegraph.co.uk/news/picturegalleries/howaboutthat/10658011/Daredevil-slackliner-Flaviu-Cernescu-crosses-200ft-deep-reservoir-overflow.html false false%> of a huge funnel at Lake Iovanu. The funnel is designed to flush away surplus water.

You are warned; this video is not for the faint-hearted!

Related Content

  • Putzmeister adds five-section pump
    January 6, 2017
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Putzmeister adds five-section pump
    April 19, 2013
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Peri launched UP MDS Formwork at INTERMAT 2012
    January 6, 2017
    Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of
  • Peri launched UP MDS Formwork at INTERMAT 2012
    February 3, 2012
    Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of