Skip to main content

VIDEO: Pittsburgh says goodbye to 108-year-old Hulton Bridge

January 27, 2016
It took 500 explosive charges to bring down a 108-year-old truss bridge in the US city of Pittsburgh and crews had three days to clear up the debris, according to local news stations.

The blasts dropped the spans of 407m-long Jonathon Hulton Bridge directly into the Allegheny River. It was the first major bridge designed by Allegheny County in the state of Pennsylvania and connected the eastern Pittsburgh city suburbs of Oakmont and Harmarville.

A new steel girder bridge, directly beside it, opened to traffic in October. It has four 3.35m-wide vehicle lanes - two in each direction – and a 1.23m wide median. There are 1.8m shoulders on each side of the road and a sidewalk on the downstream side of the bridge.

Design of the new bridge was by 5412 Gannett Fleming and the contractor was Brayman Construction. Construction management and inspection was by SAI Consulting Engineers and CDR Maguire.

For more information on companies in this article

Related Content

  • Fraser Crossing Partners chosen for new Pattullo Bridge in Canada
    February 25, 2020
    Fraser Crossing Partners consists of Acciona Infrastructure Canada and Aecon Constructors.
  • Doha’s massive ring road expressway project
    July 10, 2019
    The huge Doha ring road project will help decongest the city and improve transport for Qatar
  • Construction commencing on Pennsylvania highway stretch
    November 16, 2018
    Construction is commencing on a 4.4km stretch of the Southern Beltway in the US state of Pennsylvania. This forms part of a project for a 21km section of toll road, with its completion expected in 2022. The entire project is for the extension of the Southern Beltway from the Turnpike 576 terminus at US Route 22 in Robinson Township, to a new interchange with Interstate 79 at the Allegheny-Washington County line. The work is needed to boost capacity and improve transport, while cutting congestion for drivers
  • Australian bridge slides into position
    July 18, 2012
    A heavy rail crossing as part of Australia's EastLink motorway demanded great ingenuity and careful planning Most of the 88 bridges on the EastLink tolled motorway in, Melbourne, Australia were kept as simple and straightforward as possible. Contractor Thiess John Holland (TJH) developed its own precast yard 150km from the city, which provided many of the prefabricated materials required for the structures. This offered speed and economy while logistics and sequencing were vital for their erection. But the