Skip to main content

VIDEO: Pittsburgh says goodbye to 108-year-old Hulton Bridge

January 27, 2016
It took 500 explosive charges to bring down a 108-year-old truss bridge in the US city of Pittsburgh and crews had three days to clear up the debris, according to local news stations.

The blasts dropped the spans of 407m-long Jonathon Hulton Bridge directly into the Allegheny River. It was the first major bridge designed by Allegheny County in the state of Pennsylvania and connected the eastern Pittsburgh city suburbs of Oakmont and Harmarville.

A new steel girder bridge, directly beside it, opened to traffic in October. It has four 3.35m-wide vehicle lanes - two in each direction – and a 1.23m wide median. There are 1.8m shoulders on each side of the road and a sidewalk on the downstream side of the bridge.

Design of the new bridge was by 5412 Gannett Fleming and the contractor was Brayman Construction. Construction management and inspection was by SAI Consulting Engineers and CDR Maguire.

For more information on companies in this article

Related Content

  • Rebuilding a historic bridge linking the US and Canada
    March 8, 2016
    While many road authorities in North America are finding it difficult to stretch their bridge assets beyond half a century, one bridge is closing in on its centenary - David Arminas reports The international Peace Bridge, connecting the Canadian province of Ontario with the US state of New York, is 88 years young this year, and still going strong.
  • Well structured maintenance
    January 4, 2013
    Major bridge maintenance and replacement projects across the world are extending the life of many impressive historic landmarks as Guy Woodford reports The Tamar Bridge, part of the main A38 trunk road linking Saltash in Cornwall with Plymouth in Devon, south west England, marked its 50th anniversary with a steel deck resurfacing project involving Stirling Lloyd's Eliminator bridge deck waterproofing system. Jointly owned by Plymouth City Council and Cornwall Council, the Tamar has a suspended length of 642
  • Busy bridge in Beijing replaced quickly
    March 31, 2016
    The replacement of a very busy road bridge in China’s capital Beijing has been carried out successfully. Due to the volume of traffic using the bridge during week days, the work had to be carried out quickly so as to minimise traffic disruption. But despite being carried out in the centre of Beijing, the replacement work for the Sanyuan Bridge just took 43 hours from start to completion.
  • US city of Vancouver approves new I-5 bridge
    July 18, 2022
    Vancouver in the US state of Washington and Portland in the state of Oregon are aiming for a new road bridge with the possibility of accommodating light rail transport.